Laserfiche WebLink
13. TANK(s) TO BE INSTALLED <br />A. Steel -clad with fiberglass reinforced plastic. <br />B. Holiday test required immediately before "setting" tank(s) (35,000 - <br />40,000 volts). [Section 2635 (b) (4)] <br />C. Fiberglass [Sections 2635 (3) and 2631 (p)] <br />(1) Striker plate dimensions and materials. <br />(2) Striker plate under all accessible openings. <br />(3) Installation instructions require air testing and soaping <br />prior to installation. <br />D. Non -clad steel tank [Section 2635 (b)] <br />(1) Cathodic protection provided for entire tank, piping and <br />components (nuts, bolts, washers, etc.). <br />(2) Approved by a corrosion engineer or N.A.C.E. <br />technician. <br />(3) Document stating inspection method and frequency <br />(minimum semi-annual inspection requirement). <br />E. Other types of tanks. <br />(1) Chemical composition of material stored is provided. <br />(2) Chemical abstract service number (CAS#) <br />14. Overflow protection systems (detail drawing of spill catchment basin(s)/piping <br />sump(s) required). [Section 2635 (b) (8)] <br />A. Spill catchment basin. <br />Capacity: 5 6aL . S <br />Type: ��tL — T• T� <br />5 <br />