Laserfiche WebLink
' SW12CB, January 2002 <br />0 Page & of <br />/. UINAYL1�-Arius ssiavua®v — - <br />Test Method Developed By: ❑UDC Manufacturer R -industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum -Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: ELLDS Equipment Resolution: .0007 <br />.. . <br />UDC # lea UDC # UDC # UDC # <br />UDC Manufacturer: <br />UDC Material: <br />UDC Depth: <br />Height from UDC Bottom to Top <br />12 r r <br />of Highest Piping Penetration: <br />t 2„ <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />testing: <br />Portion of UDC Tested <br />2" above highest <br />2" above highest 2" above highest <br />2" above highest <br />penetration <br />penetration penetration <br />penetration <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />❑ Yes ❑ No NA <br />❑Yes ❑ No SNA ❑Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />roduct and water)?' <br />Turbine shutdown response time <br />N/A <br />N/A N/A <br />N/A <br />Is system programmed for fail- <br />❑ Yes ❑ No 4•NA <br />❑ Yes ❑ No IRNA ❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />safe shutdown?` <br />Was fail-safe verified to be <br />❑ Yes ❑ No % NA <br />❑ Yes ❑ No 9rNA ❑ Yes ❑ NO ❑ NA <br />❑ Yes ❑ No ❑ NA <br />operational?* <br />Wait time between applying <br />pressure/vacuum/water and <br />30 minutes <br />30 minutes 30 minutes <br />30 minutes <br />starting test <br />Test Start Time: <br />jr ` c> <br />} <br />Initial Reading (RI): <br />/3' 2 7- <br />76 es <br />Test End Time: <br />3 ., /- <br />i 7 <br />Final Reading (RF): <br />13 7 CJ <br />,T. 7 C. 7 -- <br />Test Duration: <br />15 minutes <br />15 minutes 15 minutes <br />15 minutes <br />Change in Reading (RF -RI): <br />e3e->c' V1 <br />. U --:> C' l <br />Pass/Fail Threshold or Criteria: <br />0.0020 <br />0.0020 0.0020 <br />0.0020 <br />Test Result: <br />14 Pass . ❑ Fail <br />Z Pass O Fail . ❑ Pass O Fail <br />[I Pass ❑Fail <br />Was sensor removed for testing? <br />es ❑ No ❑ NA <br />1jYes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />9 Yes ❑ No ❑ NA <br />9Yes ❑ No ❑ NA 0 Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />verified functional after testing? <br />Comments — (include information on repairs made prior to testin , and recommended follow-up for failed tests) <br />ChevrOu #20-1383 <br />1960 W.11 tb .St. <br />Tracy, Ca 95376 <br />5]1989 Nick 11arvey <br />#NI1093 <br />1 If the entire depth of the UDC is not tested, specify how much was tested If the answer to Any of the questions indicated with an <br />asterisk(*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />