Laserfiche WebLink
SWRCB, January 2002 • • Page � of 6? <br />S. FILL RISER CONTAINMENT SUMP TESTING <br />Facility is Not Equipped With Fill Riser Containment Sums ❑ <br />Fill Riser Containment Sumps are Present, but were Not Tested ❑ <br />Test Method Developed By: ❑ Sump Manufacturer RIndustry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ VacuumFiydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: ELLDS <br />Equipment Resolution: .0007 <br />Fill Sump # <br />Fill Sump # 4j' <br />Fill Sump # 9 <br />Fill Sump # <br />Sump Diameter: <br />1' " <br />'/ 1, ' ' <br />V, " <br />Sump Depth: <br />" 2 '' <br />7z" <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />1 <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />, ; <br />3 c <br />+ , <br />�''- <br />Condition of sump prior to <br />testing: <br />Portion of Sump Tested <br />2" above highest <br />penetration <br />2" above highest <br />penetration <br />2" above highest <br />penetration <br />2" above highest <br />penetration <br />Sump Material:-'Z�;Z—te-� <br />.--<r <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 minutes <br />` <br />30 minutes <br />30 minutes <br />30 minutes <br />Test Start Time: <br />G : e) 9 <br />C, 9 <br />Initial Reading (RI): <br />1. ! 5 ' <br />% <br />37 <br />Test End Time: <br />: 7 y <br />0.1 z = <br />