My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015-2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1960
>
2300 - Underground Storage Tank Program
>
PR0232534
>
COMPLIANCE INFO_2015-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
6/3/2020 9:57:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015-2016
RECORD_ID
PR0232534
PE
2361
FACILITY_ID
FA0004547
FACILITY_NAME
CHEVRON STATION #201383
STREET_NUMBER
1960
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23402001
CURRENT_STATUS
01
SITE_LOCATION
1960 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\1960\PR0232534\RETROFIT 2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F0 RECEIVED <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer Q Industry Standard ❑ Pr 5 <br /> El Other(Sped) <br /> Test Method Used: Q Pressure ❑Vacuum ❑Hydrostatic <br /> [I Other(Spec) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: PSI <br /> 7Fiberglass <br /> Piping Run#91 Piping Run# Diesel Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter: 3 Y Y <br /> Length of Piping Run: Appx 200' Appx 200' Appx 100' <br /> Product Stored: 87 Gas 91 Gas Diesel <br /> Method and location of Clam Shell Clam Shell Clam Shell <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes <br /> starting test: <br /> Test Start Time: 9:00am 9:00am 9:00am <br /> Initial Reading(Ri): 5 PSI 5 PSI 5 PSI PSI <br /> Test End Time: 10:00am 10:00am 10:00am <br /> Final Reading(RF): 5 PSI 5 PSI 5 PSI PSI <br /> Test Duration: 1 hour 1 hour 1 hour <br /> Change in Reading(RF-R,): 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 <br /> Criteria: <br /> Test Result: ❑✓ Pass ❑Fail QPass ❑Fail QPass ❑Fail ❑Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.