Laserfiche WebLink
0 0 <br />EQUIPMENT DRY -FIT <br />- BEFORE INSTALLING PENETRATION FITTINGS <br />- BEFORE CUTTING OPEN SUMP INTERSTICE <br />DRY -FIT YOUR SUMP PIECES AND INTERNAL EQUIPMENT. <br />BEFORE PENETRATING FIBERGLASS <br />WALLS ENSURE THAT THE DOUBLE WALL FRP <br />SUMP IS HOLDING VACUUM <br />. It is REQUIRED to visually check the Vacuum gauge on each and <br />Y every BravoSystems Double Wall product and write on its packaging <br />report Vacuum level, signature of observer, date and time the <br />shipment is received at every destination. <br />WARRANTY IS VOID: <br />IF ANY OF THE FOLLOWING OCCUR <br />A) There is a failure to comply with the Required written report guidelines as stated above. <br />B) Double Wall Products are DOUBLE -STACKED, stored or shipped in a negligent way. <br />C) There is a failure to handle Bravo Systems equipment with the utmost care. <br />D) Any packaging or wrapping materials are removed before the item reaches It's destination. <br />E) Double Wall Sump Products, Failure to call Bravo Systems If Vacuum level on product is <br />less than 12" HG (Vacuum) (323) 888-4133, refer to sump for further details. <br />F) If there is any indication or suspect damage, you must mark the freight paperwork <br />"Suspect Freight Damage" <br />3 ii -B8000 -9000 -DW -11B <br />