My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015-2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1960
>
2300 - Underground Storage Tank Program
>
PR0232534
>
COMPLIANCE INFO_2015-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
6/3/2020 9:57:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015-2016
RECORD_ID
PR0232534
PE
2361
FACILITY_ID
FA0004547
FACILITY_NAME
CHEVRON STATION #201383
STREET_NUMBER
1960
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23402001
CURRENT_STATUS
01
SITE_LOCATION
1960 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\1960\PR0232534\RETROFIT 2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />NEW INSTALLATION <br />During Installation, cover the UniBox with cardboard, plastic sheeting or equivalent to keep <br />debris from falling into the box. Cover all threaded connections to prevent damage to threads. <br />A - Sump Positioning <br />A.1- Determine the permanent position of the UniBox <br />inside the island according to your specs. Place two <br />support bars across the island widthwise. (Fig. A.1) <br />A.2- Rest UniBox on top of a bed of peagravel and <br />ensure the UniBox is level. The Angled supports should <br />make contact with the support bars of the island (Fig. A.1). <br />Containment boxes are marked "A" for <br />Junction box side. Refer to dispenser manufacturers <br />Junction box position. <br />UaLj Ljff,Atl►Y■ Box should be approximately 1/4" <br />above top edge of island to allow water to drain away <br />from containment box. <br />A.3- After positioning dispenser box, secure with tie <br />wire to the island support to prevent shifting during <br />concrete pour. Bolting angled supports to the support bars <br />through provided 1/4" holes is recommended. (Fig. A.4) <br />PRODUCT AND VAPOR <br />SHEAR VALVE <br />A.4- Remove top frame. If not factory installed, connect <br />either the flex connector and/or riser pipe to the bottom of <br />the shear valves outside the sump, then install all product <br />and vapor shear valve assemblies according to the <br />dispenser configuration to the provided brackets. If <br />adjustments to the position of the shear valves are <br />required, check with dispenser manufacturer's <br />configuration (Fig. A.4). See also "Section D" on page 8. <br />A.5 -PRIOR TO CUTTING OPEN <br />DISPENSER SUMP ENSURE THAT <br />THE SUMP IS HOLDING VACUUM. <br />READ PAGE 4 & 5 CAREFULLY !!! <br />If the gauge reads at or ABOVE 12 INCHES OF <br />MERCURY at this time, break vacuum and <br />proceed to Step A.6. <br />If the gauge reads BELOW 12 INCHES OF <br />MERCURY at this time CONTACT THE <br />FACTORY AT 323-888-4133. <br />Follow Step B.2 to repair leaks. <br />Fig. A.1 Anchor bottsUpper <br />frame <br />�r Mid -frame <br />Angled GG <br />Supports �DG <br />°A <br />Bar <br />-� Stipp° <br />Fig. A.4 <br />Product and Vapor <br />Shear Valves <br />Support <br />Bars <br />i eye{vat oo <br />i d Va or <br />i product an <br />i <br />1/4" Perforations Primary and Secondary piping <br />Pressure test the primary <br />line following the pipe <br />manufacturer's Installation Instructions. Refer to shear valve <br />manufacturer's Installation Instructions for details on testing. <br />4 ii -B8000 -9000 -DW -11B <br />
The URL can be used to link to this page
Your browser does not support the video tag.