My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015-2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1960
>
2300 - Underground Storage Tank Program
>
PR0232534
>
COMPLIANCE INFO_2015-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
6/3/2020 9:57:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015-2016
RECORD_ID
PR0232534
PE
2361
FACILITY_ID
FA0004547
FACILITY_NAME
CHEVRON STATION #201383
STREET_NUMBER
1960
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23402001
CURRENT_STATUS
01
SITE_LOCATION
1960 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\1960\PR0232534\RETROFIT 2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />AmunuErom <br />Remove & save the SVA -BARB from the <br />Gauge Assembly Schrader Valve <br />.1 - Use test assembly and pressure sump to 4 PSI <br />Close off with ball valve and resume other work. <br />Allow 1 Hour before recording pressure. <br />FIELD AIR INTEGRITY INSPECTION TEST : <br />Hold pressure for a minimum of 1 hour for a <br />Field Integrity Inspection Test. After <br />passing the pressure test, the sump <br />should immediately be filled with interstitial <br />C <br />monitoring fluid for the rest of the construction period. <br />Hold pressure for a minimum of 1 hour for a Field Integrity Inspection Test. <br />The Under Dispenser Containment Sump PASSES the integrity test if the Sump shows NO <br />signs of continuous pressure decay. IF TEST PASSES - CONTINUE ON TO THE HYDROSTAT- <br />IC FILL & INTEGRITY TEST, outlined in SECTION C. <br />BravoS. Systems Highly• • <br />an Extended pressure <br />a: On factory -installed gauge, pressure sump Interstice to EXACTLY 4 PSI. <br />b: Close off interstice with ball valve and soap exterior of dispenser sump body, paying close attention to <br />penetration fittings, edges and corners. <br />e: Locate leak point(s) and mark with marker so you can locate it / monitor it. <br />c: Repair or reinstall penetration fittings according to your doublewall penetration fitting manufacturers' <br />Installation / Maintenance Instructions. <br />d: Occasionally... Bravo Fiberglass Series Products may suffer mild damage in transit or field installation. <br />Please take a close look at edges and corners. <br />f: Abrade a 2" diameter area centered on the leak point until flow coat is gone and natural resin/fiberglass <br />material can be seen. Dust with shop brush or compressed air and do not use shop towels or acetone. <br />S. Bravo Systems recommends "Smith Fibercast Adhesive Kit #8014" to repair and reinforce Bravo <br />Fiberglass products. Make sure area is completely dry and apply resin generously while pulling -2 PSI <br />vacuum to suck adhesive into pinhole leak for 1 minute. For anything larger than pinhole leaks you must <br />consult the factory. <br />g: Let cure for a minimum of 4 hours @ or above 75° Fahrenheit. <br />FOR CONTINUOUS VACUUM MONITORING - The B8000 and 9000 Series Sump cannot exceed <br />16" of Mercury. Follow your vacuum system manufacturer's installationinstructions to install, <br />seal, and monitor the doublewall system with vacuum. Continue on to Step E. <br />Ensure that the fittings that are being used with the <br />Vacuum Monitored System can withstand the amount <br />of Vacuum your Monitoring System will generate. <br />6 ii -88000 -9000 -DW -11 B <br />
The URL can be used to link to this page
Your browser does not support the video tag.