My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015-2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1960
>
2300 - Underground Storage Tank Program
>
PR0232534
>
COMPLIANCE INFO_2015-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
6/3/2020 9:57:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015-2016
RECORD_ID
PR0232534
PE
2361
FACILITY_ID
FA0004547
FACILITY_NAME
CHEVRON STATION #201383
STREET_NUMBER
1960
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23402001
CURRENT_STATUS
01
SITE_LOCATION
1960 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\1960\PR0232534\RETROFIT 2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
While Fiberglassing, curing, or sitting overnight, keep the <br />SVA -BARB in place. This will relieve stress on the Interstice <br />while the sumps are heating up or cooling off. <br />SAVE THESE PIECES, DO NOT LOSE THEM! Remove the SVA -BARB when ready to test. <br />y, <br />. ... IFSV <br />A - � R is <br />�:: B B:: <br />A.6- Install all the required number of doublewall penetration fittings per their respective <br />Installation Instructions (Fig. A.4). <br />11 011 <br />• . . •; <br />ELECTRICAL FITTINGS & CONDUITS <br />.7 - Next generation Bravo UDC's feature an electrical offset frame that allows you to install your <br />conduits on the exterior of the sump and up into the side panel of your dispenser. <br />. - Following your installation of the doublewall penetration fittings, you must <br />FIRST TEST THE INTEGRITY OF THE BOX, SINCE THE INITIAL VACUUM HAS BEEN LOST. <br />.9 - Using the factory -provided & installed pressure/vacuum combination gauge, Pressure the <br />sump to 4 PSI and soap ALL fittings, and any field repairs, inside and outside. If foaming leaks are <br />found, Skip to Step B.2. <br />A.10 - Please refer to your pipe manufacturer's Installation Instructions. <br />.71 - When finished with the installation of pipe lines, pressure sump again to no more than 4 <br />PSI and soap all penetration fittings, inside and outside. Again, if leaks are found, skip to Step B.2 <br />S. Bravo Systems, Inc. Highly recommends the Air <br />Integrity Test (Step B.1) to be completed at this time, after <br />the penetration fittings have been installed correctly. <br />
The URL can be used to link to this page
Your browser does not support the video tag.