Laserfiche WebLink
While Fiberglassing, curing, or sitting overnight, keep the <br />SVA -BARB in place. This will relieve stress on the Interstice <br />while the sumps are heating up or cooling off. <br />SAVE THESE PIECES, DO NOT LOSE THEM! Remove the SVA -BARB when ready to test. <br />y, <br />. ... IFSV <br />A - � R is <br />�:: B B:: <br />A.6- Install all the required number of doublewall penetration fittings per their respective <br />Installation Instructions (Fig. A.4). <br />11 011 <br />• . . •; <br />ELECTRICAL FITTINGS & CONDUITS <br />.7 - Next generation Bravo UDC's feature an electrical offset frame that allows you to install your <br />conduits on the exterior of the sump and up into the side panel of your dispenser. <br />. - Following your installation of the doublewall penetration fittings, you must <br />FIRST TEST THE INTEGRITY OF THE BOX, SINCE THE INITIAL VACUUM HAS BEEN LOST. <br />.9 - Using the factory -provided & installed pressure/vacuum combination gauge, Pressure the <br />sump to 4 PSI and soap ALL fittings, and any field repairs, inside and outside. If foaming leaks are <br />found, Skip to Step B.2. <br />A.10 - Please refer to your pipe manufacturer's Installation Instructions. <br />.71 - When finished with the installation of pipe lines, pressure sump again to no more than 4 <br />PSI and soap all penetration fittings, inside and outside. Again, if leaks are found, skip to Step B.2 <br />S. Bravo Systems, Inc. Highly recommends the Air <br />Integrity Test (Step B.1) to be completed at this time, after <br />the penetration fittings have been installed correctly. <br />