My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015-2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1960
>
2300 - Underground Storage Tank Program
>
PR0232534
>
COMPLIANCE INFO_2015-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
6/3/2020 9:57:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015-2016
RECORD_ID
PR0232534
PE
2361
FACILITY_ID
FA0004547
FACILITY_NAME
CHEVRON STATION #201383
STREET_NUMBER
1960
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23402001
CURRENT_STATUS
01
SITE_LOCATION
1960 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\1960\PR0232534\RETROFIT 2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRAVO ELECTRICAL OFFSET FRAME <br />INSTALLATION INSTRUCTIONS <br />��►/,"�i1�'sTi�/� Make sure all electrical conduits and piping are clear of <br />any equipment or other obstructions in the dispenser. <br />Physically check your hydraulic cabinet for obstructions before any installation begins. <br />BRAVO UNDER DISPENSER CONTAINMENT ELECTRICAL OFFSET INSTRUCTIONS <br />The Frame should be fully installed and sealed with provided Vulkem before conduit installation. <br />2) Make sure all electrical conduits (piping) are clear of any equipment in the dispenser. Physically <br />check your hydraulic cabinet for obstructions before any installation begins. <br />3) Conduits must be run and tightly secured to the sump. <br />4) Pour concrete around outside of Dispenser Sump and within the conduit area. <br />Special Instructions: <br />5) You must Slope concrete within the <br />Electrical Offset opening between the <br />steel frame walls. This area MUST be <br />sloped and MUST be sealed at the areas <br />shown below. <br />Electrical Area <br />4 Concrete Island' d 4 <br />a, <br />a 4' •q s 4. <br />• •a °' a <br />Special Instructions: <br />6) You must seal where concrete or conduit meets <br />steel, as shown. Seal the downside of the slope and <br />the conduit area with Vulkem 116 or TremPro 650. <br />ii -EO -Installation -2-5-08 <br />4 <br />Concrete <br />v, <br />Steel <br />' <br />Lip <br />c <br />O <br />U <br />• <br />U <br />( <br />Sump <br />a <br />W <br />Interior <br />Sealed <br />Areas <br />FSump <br />4. <br />Interior <br />cA <br />s <br />a <br />• <br />. <br />d <br />a. <br />< <br />4 <br />a= <br />ii -EO -Installation -2-5-08 <br />Sloped <br />Concrete <br />Steel <br />' <br />Lip <br />c <br />O <br />U <br />• <br />U <br />( <br />Sump <br />a <br />W <br />Interior <br />Sealed <br />Areas <br />FSump <br />4. <br />Interior <br />ii -EO -Installation -2-5-08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.