My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
2224
>
2300 - Underground Storage Tank Program
>
PR0232555
>
COMPLIANCE INFO_2007-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:34:08 PM
Creation date
6/3/2020 9:58:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2015
RECORD_ID
PR0232555
PE
2361
FACILITY_ID
FA0003679
FACILITY_NAME
CALIFORNIA STOP*
STREET_NUMBER
2224
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16313007
CURRENT_STATUS
01
SITE_LOCATION
2224 MANTHEY RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\M\MANTHEY\2224\PR0232555\PERMANENT INJUNCTION 7-19-07.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
446
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 8 <br />22 <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Regular and Premium secondary line were plugged off. Upon removing plugs fule came out of both <br />secondary lines. <br />Reg. — I removed about 3/a of a gallon from sump. <br />Prem. — I removed about 3 gal. from sump. <br />0. btGUNUAKT rlrt i tJ i INb <br />Test Method Developed By: <br />= Piping Manufacturer 21 Industry Standard - Professional Engineer <br />- Other (Specify) <br />Test Method Used: <br />0 Pressure <br />7 Vacuum -:. Hydrostatic <br />-' Other (Specify) <br />Test Equipment Used: Pressure Gauge <br />Equipment Resolution: 0-30 psi <br />Piping Run # 1 <br />Piping Run # 2 <br />Piping Run # 3 Piping Run # <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />UK <br />UK <br />UK <br />Piping Diameter: <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />75' <br />75' <br />75' <br />Product Stored: <br />Gas <br />Gas <br />Diesel <br />Method and location of piping- <br />Sump <br />Sump <br />Sump <br />run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />5 min <br />5 min <br />5 m i n <br />starting test: <br />Test Start Time: <br />01:45 <br />02:30 <br />01:30 <br />Initial Reading (Ri): <br />5 psi <br />5 psi <br />5 psi <br />Test End Time: <br />02:45 <br />03:30 <br />02:30 <br />Final Reading (RF): <br />5 psi <br />5 psi <br />5 psi <br />Test Duration: <br />1 hr <br />1 hr <br />1 hr <br />Change in Reading (RF-Ri): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />0 <br />0 <br />0 <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Regular and Premium secondary line were plugged off. Upon removing plugs fule came out of both <br />secondary lines. <br />Reg. — I removed about 3/a of a gallon from sump. <br />Prem. — I removed about 3 gal. from sump. <br />
The URL can be used to link to this page
Your browser does not support the video tag.