My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
2224
>
2300 - Underground Storage Tank Program
>
PR0232555
>
COMPLIANCE INFO_2007-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:34:08 PM
Creation date
6/3/2020 9:58:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2015
RECORD_ID
PR0232555
PE
2361
FACILITY_ID
FA0003679
FACILITY_NAME
CALIFORNIA STOP*
STREET_NUMBER
2224
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16313007
CURRENT_STATUS
01
SITE_LOCATION
2224 MANTHEY RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\M\MANTHEY\2224\PR0232555\PERMANENT INJUNCTION 7-19-07.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
446
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 8 <br />22 <br />7. UNDER-015PEN5ER GUNTAINIVIENT UDG TESTING <br />Test Method Developed By: ❑ Sump Manufacturer rx-1 Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum 91 Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: 1 Hr. Lake Test I Equipment Resolution: <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />UDC # 112 UDC # 3/4 <br />UDC # 5/6 <br />UDC # 7/8 <br />UDC Manufacturer: <br />Western Western <br />Western <br />Western <br />UDC Material: <br />FG FG <br />FG <br />FG <br />UDC Depth: <br />30" 30" <br />30" <br />30" <br />Height from UDC Bottom to Top of <br />Highest Piping Penetration: <br />14" 14" <br />14" <br />14" <br />Height from UDC Bottom to Lowest <br />Electrical Penetration: <br />11" 11" <br />11" <br />11" <br />Condition of UDC prior to testing: <br />Dry Dry <br />Dry <br />Dry <br />Portion of UDC Tested' <br />60% 60% <br />60% <br />60% <br />Does turbine shut down when UDC <br />sensor detects liquid (both product <br />and water)?* <br />❑ Yes ❑ No ® NA ❑ Yes ❑ No I@ NA <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No IM NA <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />shutdown?' <br />❑ Yes ❑ No ® NA ❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />Was fail-safe verified to be <br />operationalT <br />❑ Yes ❑ No ® NA ❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test <br />5 min 5 min <br />5 min <br />5 m i n <br />Test Start Time: <br />03:30 03:30 <br />03:30 <br />03:30 <br />Initial Reading Ri): <br />0.0025" 0.0025" <br />0.0025" <br />0.0025" <br />Test End Time: <br />04:00 04:00 <br />04:00 <br />04:00 <br />Final Reading (RF): <br />0.0025" 0.0025" <br />0.0025" <br />0.0025" <br />Test Duration: <br />1/2 hr 1/2 hr <br />1/2 hr <br />1/2 hr <br />Change in Reading (RF-Ri): <br />0 0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />0 0 <br />0 <br />0 <br />Test Resu t: <br />-:®" Pass_ ❑ Fails 0 Pass;: Zlfaii <br />IM Pass `E[ Fail, <br />im Pass ❑ Faits. <br />Was sensor removed for testing? <br />® Yes ❑-No ❑ NA IM Yes U No ❑ NA <br />® Yes ❑ No ❑ NA <br />®Yes ❑ No ❑ NA <br />Was sensor properly replaced after <br />testing? <br />®Yes ❑ No ❑ NA ®Yes ❑ No ❑ NA <br />®Yes ❑ No ❑ NA <br />®Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.