My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1103
>
2300 - Underground Storage Tank Program
>
PR0232587
>
COMPLIANCE INFO_2001-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 11:22:36 AM
Creation date
6/3/2020 9:58:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2007
RECORD_ID
PR0232587
PE
2361
FACILITY_ID
FA0004521
FACILITY_NAME
CHEVRON USA #201761*
STREET_NUMBER
1103
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
21935038
CURRENT_STATUS
01
SITE_LOCATION
1103 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232587_1103 S MAIN_2001-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,4anuary 2002 Page 4 <br /> 7. UNDER- ISPENSER CONTAINMENT (UD TESTING <br /> Test Method Developed By: F� UDC Manufacturer Industry Standard X❑ Professional Engineer <br /> El Other (Sped) <br /> Test Method Used: FI Pressure F Vacuum Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used: VPLT Equipment Resolution: <br /> UDC# 9/10 UDC# 11/12 UDC# UDC# <br /> UDC Manufacturer: CS CS <br /> UDC Material: FIBERGLASS FIBERGLASS <br /> UDC Depth: 32 IN 32 IN <br /> Height from UDC Top to Top of 12 IN 12 IN <br /> Highest Piping Pentration: <br /> Height from UDCTop to Lowest 6 IN 6 IN <br /> Electrical Pentration: <br /> Condition of UDC prior to testing: GOOD GOOD <br /> Portion of UDC Tested: 1 14 IN 14 IN <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X JYes❑No�N Yes❑No❑N —]Yes❑No�N []Yes❑No❑N <br /> product and water)?* <br /> Turbine shutdown response time: 2-5 SEC 2-5 SEC <br /> Is system programmed for fail-safe —]Yes❑ ❑ ❑ ❑ � ❑ <br /> shutdown?* IflYes N N R Yes N N N N Yes No <br /> Was fail-safe verified to be [:] ❑ ❑ � ❑ ❑ � [:]Yes❑ [:] , <br /> operational?* F____1 Yes N N X Yes N N X Yes N N No <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 MIN 5 MIN <br /> test: <br /> Test Start Time: 10:46 10:45 <br /> Initial Reading(RI): 10.339 7.072 <br /> Test End Time: 11:01 11:00 <br /> Final Reading(RF): 10.339 7.072 <br /> Test Duration: 15 MIN 15 MIN <br /> o <br /> in Reading(R F-RI ): 0 0 <br /> l Threshold or Criteria: .05 GPH .05 GPH <br /> sor removed fortesting? X Yes N NA X YesN NA Yes N NA Yes No <br /> sor properly replaced and MYeCN�NA �Yes�Nc�NA ❑YeC]NcE]NA[:]Yes[]No❑N <br /> verified functional after testing? <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 If the entire depth of the UDC is not tested,specify how much was tested.If the answer to anv of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.