My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1103
>
2300 - Underground Storage Tank Program
>
PR0232587
>
COMPLIANCE INFO_2001-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 11:22:36 AM
Creation date
6/3/2020 9:58:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2007
RECORD_ID
PR0232587
PE
2361
FACILITY_ID
FA0004521
FACILITY_NAME
CHEVRON USA #201761*
STREET_NUMBER
1103
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
21935038
CURRENT_STATUS
01
SITE_LOCATION
1103 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232587_1103 S MAIN_2001-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUG 23 ' 01 8 : 05 FROM GE TLER RYAN TO 8425_Q60 PAGE . 004i004 <br /> F. In-Tank Gauging/SIR Equipment: ❑ Check this box if tank gauging is used only for inventory contro� <br /> ❑ Check this box if no tank gauging or SIR.equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> entry and termination,including testing for ground faults? <br /> 0 Yes El No* Has all input wiring been inspes2lo;r <br /> ❑ Yes ❑ No* Were all tank gauging probes Vislpected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system duct el readings tested? <br /> Q Yes ❑ No* Was accuracy of syste eve!readings tested? <br /> Q Yes Q No* Were all probes7eirWd properly? <br /> ❑ Yes ❑ No* Were all items o e equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,descr" a how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): C3 Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> Yes Q No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> Cl N/A (Check all that apply) Simulated leak rate: 3 g.p.h.; ❑0.1 g.p.h; 0 0.2 g.p.h. <br /> Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes (3 No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> rYes <br /> No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 1106 ❑ N/A134 <br /> ❑ No* l:or electronic Lf,Ds, does the turbine automatically shut off'if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> ❑ No* For electronic LJ_Ds, .does the turbine automatically shut off if any portion of the monitoring system <br /> ❑ N/A malfunctions or fails a test?Q No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> tA No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe bow and when these deficiencies were or will be corrected. <br /> H. Comments: .,-T <br /> U (Z <br /> TL .S : t,L S n-, e C.O." �- <br /> v7 JF � &Page 3 of 3 03/01 <br /> ** TOTAL PPi ,Z`�.'004 ) s* <br />
The URL can be used to link to this page
Your browser does not support the video tag.