Laserfiche WebLink
0 0 <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN- Pa e 2 of 2 <br /> VI.LTNDER DISPENSER CONTA NT(UDC)MONITORING (Chappa!! <br /> that apply) <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-54a <br /> ❑ 4.NO DISPENSERS [199.OTHER 490-54b. <br /> LEAK MONITOR MANUFACTURER:Veeder-Root 490-15. MODEL#:TLS-350 490-56. <br /> LEAK SENSOR MANUFACTURER:Veeder-Root 490-57. MODEL#(S):Liquid Sensor Series 794380-208 490-51. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ® a.YES ❑ b.NO 490-19. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490.60 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-61. <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a.YES ❑ b.NO 490-62. <br /> UDC CONSTRUCTION IS: ® 1.SINGLE WALL E] 2.DOUBLE WALL 490-63. <br /> IF DOUBLE WALL: 490-64& <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 490-64b. <br /> VII. PERIODIC SYSTEM TESTING <br /> ❑ 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.[23 CCR§2644.11 <br /> ❑ 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490 66. <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490.67. <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 490-61. <br /> ® a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> ® Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 490-69& <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490-696. <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490-69c. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490.69e. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490-69f <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" ago 69g. <br /> W <br /> ® This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490-70. <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> ➢ Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMAIENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 4 .71. <br /> . UST TURBINE&FILL SUMP MONITORING: PANEL MANUFACTURER: Veeder-Root MODEL TLS-350 <br /> LEAK SENSOR MANUFACTURER:Veeder-Root MODEL#(S):Liquid Sensor Series 794380-208 <br /> s AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR DOUBLE WALL TANK(S) <br /> PANEL MANUFACTURER: VeederrRoot MODEL#: TLS-350IN-TANK PROBE MANUFACTURER Veeder-Root MODEL#: MAG t <br /> a OVERFILL PREVENTION METHOD:FILL TUBE SHUT OFF VALVE OPW 71S0 <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> this plan occurs;2)all conditions that indicate a possible release are investigated;and 3.)all monitoring records are_maintain ed proxrly___ <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: 490172- TITLE:Manager: 490-73. <br /> NAME: 490-74. TITLE:Asst Manager: 490-75. <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII. 0 ER/OP TOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE r1 7 « - DATE: 49°77. <br /> I- -.- 04/20/2009 <br /> REPRESENTING:®1.Tank Owner/Operator❑2.Facility Owner/ or Q 3.Authorized Representative of Owner 490.76. <br /> APPLICANT NAME(print): 490-71. APPLICANT TITLE: 490-79. <br /> Chevron Products Co./Charles Bittle Chevron Retail HES Permit Desk <br /> (Agency nse only) This form has been and: Approved Er Approved with C a Disapproved <br /> I.aeal Agency signature: Date: <br /> C-me.ts.r speci.i C-did.- <br />