Laserfiche WebLink
. Page 4 of 9 <br /> 3. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> Sump#87-1 Sump# 87-2 Sump# 91 Sump# <br /> Sump Diameter: 48" 48" 48" <br /> Sump Depth: 83" 85" 81" <br /> Sump Material&Manufacturer: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 12" 12" 12" <br /> Highest Pi ing Penetration: <br /> Height from Tank Top to Lowest 24" 25" 23" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Fair Fair Fair <br /> Portion of Sum Tested' Above highest Above highest Above highest Above highest <br /> Sump penetration penetration penetration penetration <br /> Does turbine shut down when <br /> sump sensor detectsliquid(both ElYes EJNo®NA ❑Yes F1No®NA ❑Yes ElNo®NA ❑Yes ElNo®NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe <br /> shutdown?* ❑Yes[:1No®NA ❑Yes[_1No®NA ❑Yes[INo®NA [I Yes❑No®NA <br /> Was fail-safe verified to be <br /> operational?* ❑Z'es n No®NA ❑Yes[:]No®NA ❑Yes❑No®NA ❑Yes ElNo®NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 30 minutes 30 minutes 30 minutes 30 minutes <br /> test: <br /> Test Start Time: 12:25pm 1:OOpm 1:00pm <br /> Initial Reading(Ri): 0.1370 1.1611 0.2231 <br /> Test End Time: 12:40pm 1:15pm 1:15pm <br /> Final Reading(RF): 0.1378 1.1611 0.2236 <br /> Test Duration: 15 min 15 min 15 min <br /> Change in Reading(RF-Ri): 0.00078 0.00002 0.00055 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Was sensor removed for testing? ®Yes❑No❑NA ®Yes❑No❑NA ®Yes❑No❑NA 0 Yes❑No❑NA <br /> Was sensor properly replaced and ®Yes❑No❑NA ®Yes❑No❑NA ®Yes❑No❑NA ®Yes❑No❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> i If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />