Laserfiche WebLink
Page 5 of 9 <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC)TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: See attached testing procedures. Equipment Resolution: <br /> UDC#1/2 UDC#3/4 UDC#5/6 UDC#7/8 <br /> UDC Manufacturer: <br /> UDC Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> UDC Depth: 30" 30" 30" 30" <br /> Height from UDC Bottom to Top 8" 8" 8" 8" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 4" 4" 4" 4" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Fair Fair Fair Fair <br /> testing: <br /> Portion of UDC Tested Above highest Above highest Above highest Above highest <br /> penetration penetration penetration penetration <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes ❑No®NA []Yes❑No®NA ❑Yes ❑No®NA ❑Yes ❑No®NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail- ❑Yes ❑No®NA ❑Yes❑No®NA ❑Yes ❑No®NA ❑Yes ❑No®NA <br /> safe shutdown?" <br /> Was fail-safe verified to be ❑ ® ❑ ® ® ❑ ❑No NA ❑No®NA <br /> operational?* <br /> ❑Z'� No NA Yes No NA Yes ® ❑Yes <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test <br /> Test Start Time: 1:34pm 1:34pm 1:34pm 2:09pm <br /> Initial Reading(Ri): 0.3395 1.3160 4.2252 4.5612 <br /> Test End Time: 1:49pm 1:49 m 1:49pm 2:24pm <br /> Final Reading(RF): 0.3398 1.3160 4.2258 4.5605 <br /> Test Duration: 15 min 15 min 15 min 15 min <br /> Change in Reading(RF-Ri): 0.00034 0 0.00063 0.00070 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Was sensor removed for testing? ®Yes❑No❑NA ®Yes❑No❑NA ®Yes❑No❑NA ®Yes❑No❑NA <br /> Was sensor properly replaced and ®Yes[-]No❑NA ZYes❑No❑ ®yes No❑NA <br /> verified functional after testing? NA ®Yes❑No❑NA ❑ <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to pLny of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />