Laserfiche WebLink
Chevron <br /> April 30, 2012 <br /> Page 2 <br /> ■ 310.Approximately half a gallon of liquid was observed in the 91 and regular fill sumps. If water <br /> could enter into the secondary containment by precipitation or infiltration, it must be removed and <br /> disposed of properly. <br /> • Per the inspection report item#310 was address at the time of inspection. <br /> "The technician removed it from the 91 and regular 2 fill sump and put it in the facility's <br /> hazardous waste drum" <br /> ■ 206.The Designated operator employee training for Kristina Mangal, Robin Perez, Mary <br /> Rodriguez, Sam Bouckenooghe and Kristopher Klegu Moran was not performed. The designated <br /> operator shall train facility employees for which he or she is responsible in the proper operation and <br /> maintenance of the UST system once every 12 months. <br /> • Enclosed is the Designated Operator Facility Training Log showing that all of the employees <br /> listed above have been trained (note this is the same log faxed to you Feb 2012). <br /> Please contact me directly if you have any questions or concerns. <br /> SingerelylI,// <br /> Andrea Vilchis <br /> UST Compliance Coordinator <br /> Chevron Stations Inc. <br /> 145 S. State College., Suite 400 <br /> Brea, CA 92821 <br /> Office Phone (714)671-3223 <br /> Mailto: AVilchis cD..Chevron.com <br /> Enclosed Documents: Copy of the inspection report dated 1/19/2012; Designated Operator Facility Training <br /> Log; Return to Compliance Certification <br />