My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1103
>
2300 - Underground Storage Tank Program
>
PR0232587
>
COMPLIANCE INFO_2011-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 11:31:21 AM
Creation date
6/3/2020 9:58:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2014
RECORD_ID
PR0232587
PE
2361
FACILITY_ID
FA0004521
FACILITY_NAME
CHEVRON USA #201761*
STREET_NUMBER
1103
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
21935038
CURRENT_STATUS
01
SITE_LOCATION
1103 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232587_1103 S MAIN_2011-2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone:(209)468-3420 Fax.(209)468-3433 Web:www.sigov.orci/ehd/unitiii.htmi <br /> CONTINUATION FORM Page: 4 of 4 <br /> OFFICIAL INSPECTION REPORT Date: 01/21/11 <br /> Facility Address: 1103 S Main Street, Manteca Program: UST <br /> SUMMARY OF VIOLATIONS <br /> CLASS I,CLASS 11,or MINOR-Notice to Comply) <br /> Notes <br /> A routine inspection was performed on January 7, 2011. Gerado Acuna, Environmental Compliance for <br /> Chevron, was made aware that all time spent today is chargeable at EHD hourly rate ($122). <br /> While the technician was performing fail safe the monitoring panel would not start up again. After <br /> several attempt and help from Veeder Root the start up was unsuccessful. Inform the technician and the <br /> store manager that the monitoring panel must be repaired immediately and a permit must be obtained <br /> within the next business day for the CPU board change and cold start. <br /> The return to compliance for this facility for the inspection performed on January 7, 2011, is due by <br /> February 7, 2011. <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE(=122). <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Inspector: Received By: Title: <br /> EC <br /> EHD 23-02-003 Rev 08110/10 CONTINUATION FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.