Laserfiche WebLink
MAR 05 2003 1:51PM LASERJET 3200 p.2 <br />SWRCB. January 2002 <br />Page 3 of 7 <br />"I. NY �- - -- - - - -- - - - - -- - " <br />Test Method Developed By: [K Piping Manufacturer I industry standard Professional Engineer <br />Other (Specify) <br />Test Method Used: [X Pressure Vacuum Hydrostatic <br />Other (Specify) <br />Test EquiDment Used E III Ment Resolution: <br />'gZ�M <br />Run #3 <br />piping Run NJ Boiler Sup@ ly Piping Run #2 Boiler Return Pi it g <br />Piping Material: Fiberglass Fiber lass seepage next page <br />Piping Manufacturer: <br />A.O. Smith <br />A.O. Smith <br />Piping Diameter: <br />Length of Piping Run: <br />Product Stored: <br />DIESEL <br />DIESEL <br />Method and location of <br />i in -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test:.. <br />Test Start Time: <br />9:54 A.M. <br />9:54 A.M. <br />Initial Reading (Rl)- <br />4 lbs PSI <br />4 lbs PSI <br />Test End Time: <br />10:20 A.M. <br />10:20 A.M. <br />Final Reading W: <br />4 lbs PSI <br />4 lbs PSI <br />Test Duration: <br />I HOUR <br />1 HOUR <br />Change in Reading (Rf- <br />R1) <br />Pass/Fail Threshold or <br />Criteria: <br />Comments — (include information on repairs made prior to testing, and recommended -follow-up for failed tests) <br />