Laserfiche WebLink
MAR 05 2003 1:51PM it LASERJET 3200 0 P.3 <br />SWRCB, January 2002 Page 3 of 7 <br />4 SECONDARY PIPE TESTING <br />Test Method Developed By: . [X ] Piping Manufacturer Industry stind—ard[ '] Professional Engineer <br />Other (Specify) <br />Test Method Used: [X ] Pressure Vacuum]Hydrostatic <br />Other (Specify) <br />Test Equiment Used: E uipment Resolution: <br />P qj <br />I=.2a <br />e r I""' <br />Run #1 Generator Piping Run #2 Generator R ta III <br />IL PilRing SUPOY <br />Piping Material: Fiberglass Fiberglass <br />Piping Manufacturer: <br />A.O. Smith <br />A.O. Smith <br />Piping Diameter: <br />Length of Piping Run: <br />Product Stored: <br />DIESEL <br />DIESEL <br />Method and location of <br />ipin -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting est: <br />Test Start Time: <br />9:54 A.M. <br />9:54 A.M. <br />Initial Reading (RI) <br />4 lbs PSI <br />4 lbs PSI <br />Test End Time: <br />10:20 A.M. <br />10:20 A.M. <br />Final Reading (RI): <br />4 lbs PSI <br />-0- <br />Test Duration: <br />I HOUR <br />I HOUR <br />Change in Reading (f- <br />RI <br />Pass/Fall Threshold or <br />Criteria - <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for -Wled tests) <br />