My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0504967
>
COMPLIANCE INFO_1989-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:40:41 PM
Creation date
6/3/2020 9:58:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-2013
RECORD_ID
PR0504967
PE
2361
FACILITY_ID
FA0006440
FACILITY_NAME
SHERIFFS OPERATIONS CTR #2
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
BLVD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0504967_7000 N MICHAEL CANLIS_1989-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
571
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAR 05 2003 1:51PM it LASERJET 3200 0 P.3 <br />SWRCB, January 2002 Page 3 of 7 <br />4 SECONDARY PIPE TESTING <br />Test Method Developed By: . [X ] Piping Manufacturer Industry stind—ard[ '] Professional Engineer <br />Other (Specify) <br />Test Method Used: [X ] Pressure Vacuum]Hydrostatic <br />Other (Specify) <br />Test Equiment Used: E uipment Resolution: <br />P qj <br />I=.2a <br />e r I""' <br />Run #1 Generator Piping Run #2 Generator R ta III <br />IL PilRing SUPOY <br />Piping Material: Fiberglass Fiberglass <br />Piping Manufacturer: <br />A.O. Smith <br />A.O. Smith <br />Piping Diameter: <br />Length of Piping Run: <br />Product Stored: <br />DIESEL <br />DIESEL <br />Method and location of <br />ipin -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting est: <br />Test Start Time: <br />9:54 A.M. <br />9:54 A.M. <br />Initial Reading (RI) <br />4 lbs PSI <br />4 lbs PSI <br />Test End Time: <br />10:20 A.M. <br />10:20 A.M. <br />Final Reading (RI): <br />4 lbs PSI <br />-0- <br />Test Duration: <br />I HOUR <br />I HOUR <br />Change in Reading (f- <br />RI <br />Pass/Fall Threshold or <br />Criteria - <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for -Wled tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.