Laserfiche WebLink
MAR 05 <br />2003 1:51PM LASERJET 3200 p.4 <br />SWRCB. January 2002 to & Page 4 of 7 <br />6. PIPING SUMP TESTING <br />Sum Manufacturer [ X ] Industry Standard [ ] Professional Engineer <br />Test Method Developed By: [ ] P <br />[ ] Other (Specify) <br />Test Method Used: [ ] Pressure [ ] Vacuum [X] Hydrostatic <br />Other S ec' <br />Test E u1 merit Used CALDWELL LppEVEL GAUGE E u1 ment Resolut7ion 0.0025 <br />f •: !"iii;. if''„il.. t_"',f ..,' s I tI tai �� .. �li 5 • -,-25 4"'. �r ....t:.n:".-: <br />fj . Sum #1 Bflller NORTHI Sump #2 Generator SOUTH _Sump V <br />Sum Diameter: 36 INCH 36 INCH <br />Sum Depth: 29 INCH 33INCH <br />STEEL/FIBERGLASS <br />STEEL/FIBERGLASS <br />Sum Material: <br />Height from Tank Top to <br />Top of Highest Piping <br />8-3/4 INCH <br />13 INCH <br />Penetration: <br />Height from Tank Top to <br />Lowest Electrical <br />8-1/21NCH <br />10-1/2 INCH <br />Penetration: <br />DRY <br />DRY <br />Condition of sump prior to <br />testing: <br />Portion of Sump Tested 1 <br />[ ] YES [ ] NO <br />[X] NA <br />[ ]YES [ IND <br />[X] NA <br />YES NO <br />[ ]YES[ ] <br />[ ] NA <br />Does turbine shut down <br />when sump sensor detects <br />liquid (both product & <br />water)? <br />Turbine shutdown response <br />N/A <br />N/A <br />time: <br />Is system programmed for <br />fail-safe shutdown? <br />Was fail-safe verified to be <br />operational? <br />[ ] YES [ ] NO <br />X NA <br />[ ] YES [ ] NO <br />[X NA <br />[ ]YES [ ] NO <br />fXj NA <br />[ J YES [ ] NO <br />X] NA <br />YES NO <br />[ ] [ ] <br />I NA <br />[ ]YES[NO <br />] NA <br />FIVE MINUTES <br />FIVE MINUTES <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />9:04 A.M. <br />10:20 A.M. <br />Test Start Time: <br />Initial Reading (Rl ): <br />10:04 A.M. <br />11:25 A.M. <br />Test End Time: <br />Final Reading (Rf): <br />Test Duration: <br />ONE HOUR <br />ONE HOUR <br />Change in Reading (Ri=R1) <br />Pass/Fail Threshold or <br />Criteria <br />Uft` <br />Was sensor removed for <br />testing? <br />15 ;w7f <br />[X ]YES ` [ ] NO <br />NA <br />[X] YES [ J NO <br />NA <br />[ ] YES [ ] NO <br />NA <br />Was sensor properly <br />replaced and verified <br />functional after testing? <br />Comments — (include information <br />[ ] YES [ ] NO <br />] N/A <br />on repairs trade prior to testing, <br />[ ] YEAS [ ] NO <br />and recommended follow-up for <br />] YES [ ] NO <br />N/A <br />Tailed tests) <br />t if the entire depth of the sump is not tested, specify how much was tested. If the answer to airy of the questions indicated with an asterisk (*) is "NtY' of <br />"NA", the entire sump must be tested (SWRCB LG -160) <br />