My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_1995-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:45:30 PM
Creation date
6/3/2020 9:58:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2011
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_1995-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone:(209)468-3420 F&K. (209)468-3433 Web:www.sigov.org/ehd/unitiii.htmi <br /> CONTINUATION FORM Page: 4 of 4 <br /> OFFICIAL INSPECTION REPORT Date: 10/07/10 <br /> Facility Address: Ramos Oil-French Camp 10842 S. Harlan Rd, French Camp Program: UST <br /> SUMMARY OF VIOLATIONS <br /> (CLASS 1,CLASS 11,or MINOR-Notice to Comply) <br /> UST Inspection report continue <br /> 18. The diesel spill container failed when tested during the one hour hydrostatic test. The fill cap was <br /> replace but the spill container continued to leak. An inflatable pressure ball was used and it was position <br /> below the drain valve but the spill container continued to leak. All spill containers shall have a minimum <br /> capacity of five gallons and be capable of containing a spill or overfill until it is detected or cleaned up. <br /> Immediately contact a properly licensed, trained, and certified contractor to repair or replace the spill <br /> container under permit and inspection of the EHD. Once the permit is approved, repairs to replace the <br /> spill bucket may begin. <br /> Submit to SJC EHD within 30 days (11/08/10): <br /> 1. one copy of the completed "Return to Compliance Certification" form <br /> 2. a written corrective action statement for the above violations <br /> 3. requested/supporting documents <br /> Notes: <br /> Secondary containment next tri-annual testing due by 12/2011. <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE($122). <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHDIS CURRENT HOURLY RATE. <br /> EHD Inspe7r: Received By: Title: <br /> 4 <br /> - - 0�u_ <br /> EHD 2-003 R® 08/10/�10 CONTINUATION FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.