My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_1995-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:45:30 PM
Creation date
6/3/2020 9:58:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2011
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_1995-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> . <br /> TANK ANNULAR TESTING <br /> Test Method Developed By: x Tank Manufacturer ❑industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure x Vacuum ❑Hydrostatic <br /> ❑Other(Sped) <br /> Test Equipment U •Dwyer meter <br /> Equipment Resolution:+/-2% <br /> } Tank# 2 Tank# Tank# Tank# <br /> Is T Exempt From Testing?' x Yes ❑ o ❑Yes ❑No ❑Yes ❑ o ❑I W' m Yes ❑No <br /> Tank Capacity: <br /> Tank Material: <br /> Tank M r: <br /> Product Stored- <br /> Wait <br /> to -Wait time between applying 30 <br /> p vacu ater 30 30 30 <br /> min min <br /> startin test: <br /> Test Start Time: <br /> Initial Reading(RO: <br /> Test End Time: <br /> Final Reading(Pr): <br /> Test 'on: 1 hour I hour l hour <br /> t hour <br /> Change in Reading(RF-Ri): <br /> P ail Thresholdor Criteria: No less than1" o less thanI" o less thanI" No less I" <br /> Test t: ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pas ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testine x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑ <br /> NA <br /> Was sensor properly replaced and x Yes ❑ o ❑ A x Yes ONo DNA x Yes ❑No ❑NA x Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> Tank is brine filled <br /> ' <br /> Sendrycontamment sYstems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum, exempt from periodic containment <br /> 4 *;na frati%fnrnia r^Ap of R pmeratieana T7tIP 11 QAr*;^,,n 762'7(%V611 <br />
The URL can be used to link to this page
Your browser does not support the video tag.