My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_1995-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:45:30 PM
Creation date
6/3/2020 9:58:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2011
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_1995-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIEPE TESTING <br /> Test Method Developed By: X Piping Manufacturer 0 Industry Standard ❑Professional Engineer <br /> d Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> D Other(Specj&) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution:0-15 PSI <br /> � <br /> Piping un 1 Piping n#2 Piping un 3 'p' un <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Pip' Manufacturer. Smith Smith Smith Smith <br /> Piping Diameter: 499 4" 499 4T9 <br /> Length of Piping Run: 130' 20' 20' 20' <br /> Product Stored: Diesel Diesel Diesel Diesel <br /> Method and location of Test boot Test boot Test boot Test boot <br /> i mg—mg-nm isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 <br /> min <br /> starting test: <br /> Test Start Time: 11:25 9: 9:05 9:10 <br /> Initial Reading }: 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time: 12:25 10:00 10:05 10:10 <br /> Final Reading(RF): 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test 'on: 1 Hour I Hour 1 Hour I Hour <br /> Change Reading 0 0 0 0 <br /> Pass/Fail Threshold or 0 drop 0 drop 0 drop 0 drop <br /> Criteria: <br /> Test Result: z Pass ❑Fail z Pass ®Fail z Pass Q Fait z Pass ❑Fail <br /> Comments—(include iqorm ation on re irs made prior to testing,and recommended ollow-u forailed tests) <br /> Replaced test boot in sump#1 (main product) <br />
The URL can be used to link to this page
Your browser does not support the video tag.