My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_1995-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:45:30 PM
Creation date
6/3/2020 9:58:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2011
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_1995-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S CB,January 2002 <br /> Page of <br /> 7. - ESER CONTAINMENT"C <br /> J,TESTING <br /> Test method Developed By. ❑UDC Manufacturer ❑industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method U ❑Pressure ❑vacuum X Hydrostatic <br /> ❑Other(Sped) <br /> min <br /> Test Equipment Used: Caldwell Systems pent Resolution: .005/30 <br /> 'a, UDC#74A&5AA 5 # # <br /> UDC M ufa r:UDC Material: FFiber lass <br /> UDC De the 39" <br /> Height from UDC Bottom to Top 699 <br /> 6„ <br /> of i est P' in Penetration: <br /> 8,9 <br /> Height from UDC Bottom to 8» <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry <br /> testing: <br /> Portion of T 2"above Hi est Pi in Penetration <br /> Does turbine shut down when <br /> sensor det liquid x Yes ❑ o ❑ A x Yes ❑ ❑ Oyes ❑ o ❑ ❑Yes ❑ ❑NA <br /> productUDC and water)?` <br /> Turbine shutdown e <br /> Is system programmed for fail- x Yes ❑ o ❑NA x Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> safe shutdown? <br /> Was fail-safe verified to beNA <br /> ❑Yes x o ❑ A ❑Yes x Ox ❑Yes ❑No ® ❑Y ® ❑ <br /> o 'onal?` <br /> Wait time between applying min <br /> pressure/vacuum/waterd 5 min 5 5 5 <br /> starting t <br /> Test Start Time: 9:15 9:10 <br /> , 99 <br /> .00" .0Q98 <br /> Initial )• <br /> Test End Time: 9:45 9:40 <br /> Finaljeadin f): •00 .00 <br /> Test tion: 30 30 min 30 min 30 min <br /> Change in R in (RF- : <br /> min <br /> P ail old or Criteria: .005/30 .005/30 .005/30 005/30 <br /> Test Result: a Pass ❑Fail a Pan ❑Fail ❑ pass ❑Fail ❑ pan ❑Fail <br /> Was sensor removed for tes °Land <br /> x Yes ❑ o ❑ A x Yes ❑No ❑NA x Yes ❑ o ❑NA x Yes ❑ o ❑NA <br /> Was sensor properly replacex Yes ❑No ❑NA xYes ❑ o ❑NA x Yes ❑No ❑NA x Yes ❑ o ❑NA <br /> v ctional r tes ' <br /> Comments—(include it formation on re irS made prior to testing; and recd follow-up for failed tests) <br /> I If the entire depth of the UDC is not tested,specify how much was tested. If the answer to My of the questions indicated an <br /> asterisk(*)is"NO"or"NA",the entire uDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.