My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_1995-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:45:30 PM
Creation date
6/3/2020 9:58:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2011
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_1995-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page of <br /> swRcB,1an 2002 <br /> 7. - 5 <br /> Test Method Developed By: ❑ an ❑Industry S X fessional Engineer <br /> ❑other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> inin <br /> Test Equipment Used: Caldwell Systems pment Resol "on: . 5/30 <br /> UDC <br /> IA #I 2 2 # <br /> OR <br /> Mill 11111,11,1 1 <br /> UDC Manufacturer, <br /> WM1 rn Western Western <br /> UDC Material: Fi ass Fibe lass Fiber lass Fibe s <br /> the 28" 28" <br /> 28 289, <br /> UDC <br /> T1Height from UDC Bottom to Top "1" <br /> 74, <br /> of Hi est Pi in Penetration: 9,9 8" <br /> Height from Bottom to <br /> 10" <br /> 999 <br /> Lowest Electrical Penetration: Dry Dry <br /> Condition of UDC prior to Dry Dry <br /> to pi Penetration <br /> portion of UDC Tested 2"above <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both x Yes ❑ o ❑ A x Yes ❑ ❑ x Yes ❑No ❑ x Yes ❑No ❑ A <br /> roduct water)?' <br /> Turbine shutdown e <br /> Is sys eru programmed r ed for fail- x Yes ❑No ❑NA x Yes ❑ o ❑ A x Yes ❑No ❑NA x Yes ❑No ❑ A <br /> safe <br /> wn? <br /> Was fail-safe verified to be ❑yes x o ❑ A ❑Yes x No ❑ ❑Yes x o ❑N ❑Yes x o ❑NA <br /> o 'onal?° <br /> Wait time between applying 5 min 5 min 5 min <br /> pressure/vacuum/water and 5 rain <br /> sg test 10 25 9:45 9:25 <br /> Test S Time: 10:25 „ <br /> g�� <br /> Reading .00" . 49 •®/111049 <br /> Initial 1015 9.55 <br /> Test End Time: 10:55 10:55 <br /> .QQ .QQ <br /> F" Readin (RF): 3® 3000 min- 30 min 30 min <br /> Test "on: <br /> Change in Rea " Rr): 00 .00 .005/30 min <br /> Pass/Fail hold or Criteria: .005/30 005/30 min 005/30 <br /> Fail <br /> TestResult: z Pass 0 FAR z pan ❑FaH z pm ❑Fail z Pan ❑ <br /> Was sensor removed for tes • ? x Yes ❑No ❑NA x Yes ❑No ❑ x Yes ❑ o ❑ A x Yes ❑ o ❑NA <br /> Was sensor properly replaced and x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑ o ❑NA x Yes ❑ o ❑NA <br /> verified functional r to ? <br /> Comments (include inf ation repairs made prior to testin& recommended follow-up for failed tests) <br /> 'If the entire depth of the UDC is not tested,specify how much was If the answm to_y of the questions indicated <br /> asterisk(*)is"NO"or"NA",the entire uDc must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.