F9. Install Polyethylene Top and <br />Backfill <br />After completing all piping and electrical piping connections: <br />• Verify final grade. <br />• Trim top of turbine enclosure (if necessary). <br />• Place polyethylene top over turbine enclosure <br />❑ This top is designed to prevent water runoff from entering <br />turbine enclosure only. <br />• Position top and press down to seat the top onto the turbine <br />enclosure. <br />• Backfill to turbine enclosure top. <br />Polyethylene Top (42" Diameter) Top Lid <br />0.D. Model Diameter (O.D.) <br />PT42-23 23" <br />PT42-27 27" <br />PT42-32 32" <br />For Owens-Corning supplied 48" containment collar and <br />turbine enclosure: <br />• Place 48" x 42" reduction collar over turbine enclosure. <br />• Place 42" polyethylene top over reduction collar. <br />• Backfill to turbine enclosure top. <br />42" I.D. HDPE Lid (23", 27", or 32") <br />10" HDPE Top <br />6" HDPE Reduction <br />Collar (48" x 42") <br />FRP Turbine <br />2,3,4, or 5' Enclosure <br />2" <br />L 48" I.D. 48" Containment Collar <br />41/2 "T <br />F10. Top Clearances <br />Important: Isolate Turbine Enclosure From Direct <br />Traffic Loading. <br />After backfilling to top of turbine enclosure: <br />• Place 1 1/4" of specified gravel and then 3/4" thick plywood <br />(4'x 4') over top (but not over lid) to allow a 2" minimum <br />clearance between top of turbine enclosure and bottom of <br />concrete pad. <br />❑ This 2" clearance also provides a channel for water runoff. <br />If the tank is located in a traffic area: <br />• Pour 9" thick traffic slab with extra rebar reinforcement <br />directly onto plywood. <br />F11. Sealable Turbine Enclosure <br />Do Not Air Pressure Test Sealable <br />AWARNING Turbine Enclosure. See Section F7 For <br />Testing Methods. Sealable Turbine <br />Enclosures Must Be Isolated From Direct <br />Traffic Loading. <br />To prevent water infiltration in high groundwater <br />conditions (sealable turbine enclosures are not product <br />tight) sealable turbine enclosure must: <br />• Be mounted and cemented to tank collar using same <br />procedure described in section F5. <br />• Have its top mounted and cemented in place. <br />• Use electrical couplings kit provided by Owens-Corning. <br />• Use seal off fittings to make electrical wiring connections <br />leak free . (If it is to be leak tested using standing water test). <br />• Use FRP couplings for pipe connections. Do not use <br />rubber grommets which are not watertight and will leak in <br />high groundwater conditions. <br />• Always vent sealable turbine enclosure. The 2" lid fitting <br />can be used as a vent with piping leading to a point above <br />the groundwater table. <br />To adjust for final burial depth: <br />• Trim bottom of sealable turbine enclosures or bottom of <br />fiberglass sealable turbine enclosure top. <br />• Cement in place using kit AD and allow adhesive to cure. <br />• Torque lid bolts to 25 ft. -lbs. Follow ASTM specifications <br />for "Structural Joints Using ASTM A325 or A490 Bolts". <br />• The gasket is a maintenance item which will have to be <br />replaced periodically or when it shows a leak during a <br />tightness test. <br />• Test both joints of enclosure using standing water test <br />described in section F7. <br />Sealable Turbine Enclosure (42" or 48" Diameter) <br />Plywood (48"x48" x 3/4") <br />Street Box <br />HDPE Friction Reinforced <br />Fit Lid Concrete' <br />Moder length (L) <br />STE 42B-2 2' <br />5'h„� <br />2 —F -V, <br />Polyethylene Top <br />Tom— <br />onal Field Installed <br />Field Installed <br />rical Coupling for <br />Coupling <br />trical Connections <br />(Kit FC -3) <br />LField <br />STE 48B - 2 2' <br />onded Joint (Kit Ad) <br />Field Bonded <br />nment Collar <br />Containment Collar <br />Sensor.(CCS) <br />#5 Rebar 8" on center, both ways, extending 4'0" in all directions <br />from center <br />After backfilling to top of turbine enclosure: <br />• Place 1 1/4" of specified gravel and then 3/4" thick plywood <br />(4'x 4') over top (but not over lid) to allow a 2" minimum <br />clearance between top of turbine enclosure and bottom of <br />concrete pad. <br />❑ This 2" clearance also provides a channel for water runoff. <br />If the tank is located in a traffic area: <br />• Pour 9" thick traffic slab with extra rebar reinforcement <br />directly onto plywood. <br />F11. Sealable Turbine Enclosure <br />Do Not Air Pressure Test Sealable <br />AWARNING Turbine Enclosure. See Section F7 For <br />Testing Methods. Sealable Turbine <br />Enclosures Must Be Isolated From Direct <br />Traffic Loading. <br />To prevent water infiltration in high groundwater <br />conditions (sealable turbine enclosures are not product <br />tight) sealable turbine enclosure must: <br />• Be mounted and cemented to tank collar using same <br />procedure described in section F5. <br />• Have its top mounted and cemented in place. <br />• Use electrical couplings kit provided by Owens-Corning. <br />• Use seal off fittings to make electrical wiring connections <br />leak free . (If it is to be leak tested using standing water test). <br />• Use FRP couplings for pipe connections. Do not use <br />rubber grommets which are not watertight and will leak in <br />high groundwater conditions. <br />• Always vent sealable turbine enclosure. The 2" lid fitting <br />can be used as a vent with piping leading to a point above <br />the groundwater table. <br />To adjust for final burial depth: <br />• Trim bottom of sealable turbine enclosures or bottom of <br />fiberglass sealable turbine enclosure top. <br />• Cement in place using kit AD and allow adhesive to cure. <br />• Torque lid bolts to 25 ft. -lbs. Follow ASTM specifications <br />for "Structural Joints Using ASTM A325 or A490 Bolts". <br />• The gasket is a maintenance item which will have to be <br />replaced periodically or when it shows a leak during a <br />tightness test. <br />• Test both joints of enclosure using standing water test <br />described in section F7. <br />Sealable Turbine Enclosure (42" or 48" Diameter) <br />Moder length (L) <br />STE 42B-2 2' <br />5'h„� <br />f 12” Top (FRP) <br />STE 42B-3 3' <br />12�� <br />/ Turbine <br />STE 42B-4 4' <br />1 <br />Enclosure <br />STE 48B - 2 2' <br />1 <br />Field Bonded <br />STE 48B - 3 3' <br />Joint <br />1 <br />STE 48B-4 4' <br />L <br />• Excludes secondary <br />piping connections and <br />61/2" <br />Detail <br />Containment <br />////����Tank <br />/ Wall <br />adhesive kits. <br />Collar <br />Continued on next page. 23 <br />