Laserfiche WebLink
Adhesive Applications Guidelines (cont). <br />Warm weather (between 61°F and 85°F): <br />-Adhesive will harden in approximately 30 minutes. <br />❑ No supplemental heat required. <br />Hot weather (above 85°F): <br />• Apply adhesive more rapidly (it will harden in 15 <br />minutes). <br />• (Alternate) Cool the adhesive to 60°F to slow down <br />chemical reaction. <br />❑ Increase allowable application time. <br />When required for FRP coupling: <br />• Recommended method for supplemental heat is a hand <br />held heat gun (maximum output temperature 200°F). <br />Important: Mix unused tubes of catalyst and any <br />unused adhesive to form a solid for safe disposal. <br />Then dispose as a non -hazardous waste in accordance <br />with federal, state and local regulations.) <br />F6. Piping Connections <br />Secondary piping can be connected to the turbine enclosure <br />using the field installed FRP coupling or rubber grommet. <br />(both are available from Owens -Coming as optional fitting <br />kits). <br />FRP coupling <br />• Provides water -tight seal at piping penetration for high <br />groundwater conditions. <br />• See section G3 for detailed installation instructions. <br />Rubber grommet <br />• Provides compression seal to prevent water run-off <br />from entering turbine enclosure at piping penetration. <br />❑ Not recommended for high groundwater conditions. <br />FRP Coupling Detail <br />FRP Secondary Pipe <br />Installed in Grommet <br />Turbine <br />Enclosure Exterior <br />Taper ti FRP Secondary <br />Containment Pipe <br />.� Turbine 7�d <br />Enclosure Exterior Rubber Grommet <br />• See section G4 for detailed installation instructions. <br />To minimize water infiltration in turbine enclosure, <br />FRP couplings or grommets: <br />• Can be installed anywhere on the turbine enclosure. <br />❑ Provided they do not interfere with adhesive channel. <br />❑ Must be aligned radially to turbine enclosure center. <br />22 <br />F7. Hydrostatic Water Test <br />AWARNING Failure to Properly Test and Seal Joints <br />May Result in Product Loss, Environ- <br />mental Damage, Explosion or Fire. <br />• The gasket is a maintenance item which will have to be replaced <br />periodically or when it shows a leak during a tightness test. <br />• Test both joints of enclosure using a standing water test, <br />described below. <br />HDPE Lid (Non -Sealable) Model <br />To test joint seal between the collar and turbine enclosure: <br />• Fill turbine enclosure with water 3" above joint seal. <br />• Record the liquid level. <br />• Wait 24 hours. <br />• Remeasure and record the liquid level. <br />❑ A liquid change more than 1/4" indicates a possible leak. <br />To test seal of field mounted fittings: <br />• Fill turbine enclosure with water 3" above fittings. <br />• Record liquid level <br />• Wait 24 hours. <br />• Remeasure and record liquid level. <br />❑ A liquid change more than 1/4" indicates a possible leak. <br />Sealable Model <br />To test both adhesive joints and lid seal: <br />• Attach a 2" pipe to the 2" lid fitting. <br />❑ Test before other pipe connections are made through the <br />turbine enclosure. <br />OR <br />❑ Block off the secondary containment pipes <br />• Fill the enclosure until water is between 1 foot and 5 feet <br />high in the standpipe behind the lid. <br />• Wait 3 hours. <br />• Record the water level in pipe. <br />• Wait 4 hours. <br />• Remeasure and record the water level in the pipe. <br />❑ A liquid level change of more than 1" indicates a possible <br />leak. <br />If no leak is indicated: <br />• Remove all water. Failure to remove water may result in <br />collar freeze rupture during winter. <br />• Continue normal operation. <br />If a leak is suspected: <br />• Contact Owens -Coming Field Service Office nearest you. <br />Phone numbers are on page 2. <br />F8. Electrical Connections <br />Installing electrical fittings on turbine enclosure: <br />• All wiring connections must conform to local and national <br />electric codes. <br />• Connect electrical conduits to threaded steel couplings. <br />❑ Four fittings are provided in optional electrical fitting kit <br />to accommodate wiring to submersible pump and optional <br />monitoring sensor (see section G6). <br />• Optional rubber grommets can be used to field -install the <br />electrical fittings on the turbine enclosure (see section G4 <br />for details). <br />❑ Not recommended for high groundwater conditions. <br />