My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_1995-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:45:30 PM
Creation date
6/3/2020 9:58:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2011
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_1995-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19; Secondary container other th le -walled tanks (includes interception <br />0 <br />and detection systems). [Section 2633 (f)] <br />_ A. Backfill in secondary container. [Section 2635 (c) 1-83 <br />_ B. Pore space of granular material used as backfill for primary container(s) complies with Section 2631 <br />(g). [Engineering data to support capacity requirement]. <br />C. Two or more primary containers within secondary container. (include information on product <br />compatibility) <br />_ <br />D. Secondary container capable of precluding highest anticipated groundwater. <br />E. Secondary container sloped to a monitoring sump from which leakage or precipitation can be detected <br />and removed. <br />F. Nater tight corner which extends at least a foot beyond each boundary of the secondary container <br />excavation, sloped to drain away from excavation. <br />20. Secondary container(s) thickness, density, composition, product compatibility. <br />_ Sized to curtain unauthorized releases from primary containers to allow sufficient time for detection and removal. <br />[Section 2631 (c)] <br />21, Secondary container(s) volumetric requirements: [Section 2631 (e) (1) <br />and (2)] <br />A. Single primary containers = 100%. <br />B. Multiple primary containers = 150% of largest primary container or 10% above aggregate. <br />22. Secondary container(s) open to rainfall. [ Section 2631 (f)] <br />Volumetric requirements = 24 hours of 100 year storm in addition to primary container volumes. <br />23. Secondary container floor. [Section 2631 (i)] <br />A. Constructed on firm base. <br />B. Sloped to collection sump ( 1/8 inch per foot). <br />(1) One or more access casings installed in sump. <br />(a) Size to allow naval of collected liquid. <br />(b) Extended to ground surface. <br />_ (c) Covered with a locked waterproof cap or <br />within a secured facility. <br />(d) Thickness allows for anticipated stresses. <br />(e) Construction materials are not weakened stored product or wilt not donate, <br />capture, or mask constituents to be monitored. <br />24. Membrane liner specifications. [Section 2631; k, 1, and mm] <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.