Laserfiche WebLink
SECONDARY , E. <br />,SVATRCB, January 2002 <br />Page of <br />Test Method Developed By: Piping Manufacturer hdustry Standard E Professional Engineer <br />Other (Specify) <br />Test Method Used: pressure 0 Vacuum C Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />Piping Run # f Piping Ran # 2, <br />Piping Ran # <br />Piping Run # <br />Piping Material: <br />Piping Manufacturer: U v� <br />Piping Diameter: <br />Length. of Piping Run: <br />Product Stored: <br />Method and location of <br />piping -run isolation: Imo` i ,� 5:�; nC' � i:, i , N S- rt c <br />Watt time between applying <br />pressurelvacuum/water and <br />starting test: I ♦°v+ <br />Test Sian Time: 2 to <br />initial Reading (R1): <br />Test End Time: E° i <br />Final Reading X): L "� <br />Test Duration: <br />Change in R (RF -R;): <br />PaswFail Threshold or <br />Criteria: <br />b" <br />i-'11 11 ' 1 s, s; J ♦. J J ' J♦ J;♦ 91 ♦ <br />