Laserfiche WebLink
r <br />SWRCB, January 2002 Page of <br />5. PIPING SUNW TESTING <br />Test Method Developed By: E'Sump Manufacturer Xndustry Standard Professional Engineer <br />❑ Other (Specify) i <br />Test Method Used: 0 Pressure n Vacuum Ji ydrostatic <br />0 Other (Specify) <br />Test Equioment Used: ! Eauiument Resolution: <br />Comments — (inciude in ormemon on repairs made prior to testing, and recd dfodlow�for failed tests) <br />0 <br />' If the entire depth of the sump is not tested specify how much was tested. if the answer to An <br />of the questions indicated with an <br />asterisk {*) is `N- O" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />Sump # C <br />Sump # <br />Sump # ISUMP <br />Sump. Diameter: <br />— <br />Sump Depth. <br />a <br />Sump Material: <br />_ <br />Height from Tank Top to Top of <br />£ t <br />Highest Piping Penetration: <br />/ <br />Height from Tank Top to Lowest <br />ElecUical Penetration: <br />Z, <br />Condition of sump prior to testing: <br />Portion of Sump Tested <br />Does turbine shut down when <br />� <br />sump sensor detects liquid {both <br />es 0 No 0 NA <br />, _ -- i? No :DNA <br />0 Yes 0 No DNA <br />0 Yes n No D NA <br />product and water)?` <br />Turbine shutdown response time <br />Is system progtaiumed for fail-safe <br />2 -Yes 0 No 0 NA <br />. es 0 No 'ONA <br />! C Yes C No DNA <br />0 Yes 0 No D NA <br />shutdown? <br /># <br />Was failsafe verified to be <br />o erationaW. <br />0 Yes .9- ' ❑ NA <br />D Yes 71. -to DNA <br />C Yes ENo II NA <br />Yes C No 0 NA <br />Waist time between applying <br />pressure/vacuum/water and starting <br />test: <br />) M.1 IV <br />Test Start Time: <br />1,- 3 % <br />Initial Reading (R4): <br />Test End Time: <br />Final Reading (RF). <br />Test Duration: <br />Change in Reading (Rf-R): <br />PassfFaii Threshold or Criteria: <br />Was sensor removed for tesung? <br />_2' es 0 No 0 NA <br />0 Yes 0 N DNA <br />C Yes 0 No DNA <br />D Yes D No DNA <br />Was sensor properly replaced and <br />es 0 No 0 NA <br />D Yes C No DNA <br />0 Yes 0 No DNA <br />0 Yes 0 No 0 NA <br />verified fimctional after testis ? <br />Comments — (inciude in ormemon on repairs made prior to testing, and recd dfodlow�for failed tests) <br />0 <br />' If the entire depth of the sump is not tested specify how much was tested. if the answer to An <br />of the questions indicated with an <br />asterisk {*) is `N- O" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />