Laserfiche WebLink
SWRCB, January '.002 Page of <br />6. UNDER -DISPENSER CONT NT "DC TESTING <br />Test Method Developed By: E,- U -DC Manufacturer Industry Standard -7 Professionai Engineer a <br />Other (Specify) <br />Test Method Used: 11 Pressure ❑ Vacuum ❑ Hydrostatic <br />E, Other (Specify) <br />Test Equipment Used: Equipment Resolution: <br />N. k K. <br />. 6 <br />.4 <br />9 <br />F if the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire LTDC must be tested. (See SWRCB LG -160) <br />Irfol <br />EliHeight <br />OfLL <br />u <br />from UDC Bottom to <br />Lowest Electrical Penetration: <br />Condition of1JDC prior to <br />Il If* ft1YA <br />On-Z"folmax <br />0Yes <br />ONo ONTA <br />0 Yes <br />0s0 NAwt-of�wi <br />■fry <br />Y,# <br />■ C: <br />Y® <br />:.Z. <br />111,17 •: <br />:.. <br />'. • .: <br />rw: <br />■ Y. <br />F Wait time -between apply* <br />pressirehracuum4mer and <br />'t.. ' i ' ".A <br />Test Start Time: <br />. <br />ygr5: <br />0 <br />$ <br />8'.1'x:. <br />,v:' �■ �, I. : <br />■ �,s+:: <br />ORMWE <br />> : <br />■OMm <br />„` <br />4 AIRM <br />t ■ <br />�ML <br />El -Yes <br />. 6 <br />.4 <br />9 <br />F if the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire LTDC must be tested. (See SWRCB LG -160) <br />