Laserfiche WebLink
11 <br />D. Results of Testing(Servicip <br />E <br />Software Version Installed: 11, 9( z- A 4 ? <br />Conmlete the followinLy checklist: <br />Z�-Ygs <br />El No* <br />Is the audible alarm operational? <br />0 NO* <br />Is the visual alarm operational? <br />r,s- <br />0 No"' <br />Were all sensors visually inspected, functionally tested, and confirmed o2erational? <br />a -Yes <br />0 No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br />not interfere with their ro er operaaon? <br />0 Yes <br />El No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br />Erl/A <br />operational? <br />es <br />❑ No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />U N/A <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shut -down? (Check all that apply) umpfrrench Sensors; UMspenser Con int Sensors. <br />Did you confirm positive shut -down due to leaks and sers or failureldisconnection? 2'?es; U No. <br />0 Yes <br />El No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br />i�/A <br />mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br />fill point(s) and operating properly? If so, at what -percent of tank capacity does the alarm trig, --,O _ <br />0 No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br />-&P"— <br />and list the manufacturer name and model for all replacement 2arts in Section E, below. <br />Yes* <br />No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that <br />Product; U Water. If yes, describe causes in Section E, below. <br />Q No* <br />Was monitoring system set-up reviewed to ensure proper sLttn2? Attach set up reports, if applicable <br />Z-Ycs <br />El Na* <br />Is all p!2gLtorinment o <br />I ational Mr manufacturer's REifications? Sq!�ppE__ <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />Page 2 of 3 03/01 <br />0 <br />