My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
437
>
2300 - Underground Storage Tank Program
>
PR0506406
>
COMPLIANCE INFO_1996-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2023 3:00:08 PM
Creation date
6/3/2020 9:58:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2008
RECORD_ID
PR0506406
PE
2361
FACILITY_ID
FA0002313
FACILITY_NAME
WILSON WAY CHEVRON
STREET_NUMBER
437
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15113052
CURRENT_STATUS
01
SITE_LOCATION
437 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506406_437 N WILSON_1996-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In -Tank Gauging / SIR Equipment: eCheck this box if tank gauging is used only for inventory control. <br />0 Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following ehei+dLrd: <br />Q Yes <br />El No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults' <br />Ll Yes <br />LJ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />El Yes <br />Zl No* <br />Was accuracy of system product level readings tested? <br />Q Yes <br />El No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />13 No* <br />Were all probes reinstalled properly? <br />El Yes <br />U No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section K below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): L1 Check this box if LLDs are not installed. <br />Canmiet,- the fhUnwincr rhpi-Mid- <br />Yes <br />0 No* <br />U N/A <br />For equipment start-up or annual equipment c5pFication, was a leak simulated to verify LLD performance? <br />(Check all that apply) Simulated leak rate: 31 g.p.h.; U 0.1 g.p.h ; U 0.2 g.p.h. <br />TYes <br />0 No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Ef �Yes <br />I U No* <br />Was the testing apparatus properly calibrated? <br />IrYes <br />0 No* <br />Q N/A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ Yes <br />U No* <br />UIN/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />0 Yes <br />0 No* <br />CKNIA <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />or disconnected? <br />Q Yes* <br />24/0A <br />0 <br />For electronic LLDs, To—es the turbine automatically shut off if any portion of the monitoring system malfunctions <br />or fails a test? <br />U y <br />Q * <br />FrN/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />Yes <br />Q No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />- in tne accuon r4 Delow, oesmf3e now ana wnen tnese diffloencies were or wffl be corrected. <br />Page 3 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.