Laserfiche WebLink
SWRCB,January 2002 Page 3 of 7 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: .\❑ping Manufacturer ❑ Industry Standard ❑Professional Engineer <br /> Other(Spec) <br /> Test Method Used: ressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: j, s, Equipment Resolution: 1 <br /> Piping Run# i Piping Run# Z_ Piping Run# Piping Run# <br /> Piping Material: 1�i 1 m 1 rs e � ,„ <br /> Piping Manufacturer: <br /> Piping Diameter: t l r 1 <br /> Length of Piping Run: A. l <br /> Product Stored: jL� 1 t 0,o <br /> VA1 <br /> Method and location of t p !s®d4- ,1+ 3 bee){- ,d� <br /> i in -run isolation: <br /> between applying ; <br /> [:pressuret/ cuum/water and <br /> est: l L'o v 1 8 t,,V s' <br /> Test Start Time: " 60 l ° <br /> Initial Reading(Rj): P 5 -t- <br /> Test End Time: U U 2 00 j <br /> Final Reading(RF): � p <br /> Test Duration: LA u <br /> Change in Reading(RF-Rj): ! P S T �+a <br /> Pass/Fail Threshold or <br /> A, <br /> Criteria: e 16 S o 40 L•c <br /> Test Result: Pass ❑Fail apass ❑Fail P ❑ Pass ❑Fail' ❑ Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br />