Laserfiche WebLink
* SWRCB,January 2002 <br /> Page I of <br /> 6. PIPING SUNIP TESTING <br /> FMethodeveloped By: ❑SumpManufacturer ❑ Indust StandardD Professional Engineer <br /> ❑Other(Spec�)sed: ❑Pressure ❑ Vacuum <br /> ydrostaeic <br /> ❑Other(Specifi,) <br /> Test Equipment Used: �( 1 L <br /> � Resolution: <br /> Sump# Sump# Z ''Sump# # <br /> Sump Diameter: um P <br /> Sump Depth: <br /> Sump Material: r <br /> Height from Tank Top to Top of <br /> Hi hest Piping Penetration: L1 i o: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Sa t s�uw® <br /> Portion of Sump Tested' <br /> Does turbine shut down when <br /> sump sensor detectsliquid(both es ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑ o ❑NA <br /> roduct and water)? <br /> Turbine shutdown response time ND I�,GL � <br /> Is system programmed for fail-safe C" <br /> shutdown?* es ❑No ❑NA es ❑No O NA ❑Yes ❑NA ❑Yes No ❑NA <br /> Was fail-safe verified to be <br /> o rational?` ❑Yes ;1401 ❑NA ❑Yes ONO ❑NA ❑Yes ❑ o ❑NA ❑Yes No ❑NA <br /> Wait time between apph ing <br /> pressure/vacuum, ate r d starting <br /> test: <br /> Test Start Time: <br /> Initial Reading(111): <br /> Test End Time: d Z z u <br /> 12-, <br /> Final Reading(RF): <br /> �f".�`�- C' �.+,..Q <br /> Test Duration: <br /> Change in Reading(RF-Ri): v <br /> Pass/Fail Threshold or Criteria: 0 05 30 Int e� <br /> Test Result: I Pass ❑Fail <br /> Pass ❑Fail Pass ❑ if Pass ❑ ail <br /> Was sensor removed for testing? es ❑No ❑NA es ❑No ❑NA ❑ es ❑No ❑SVA [:)' es ❑No A <br /> Was sensor properly replaced and <br /> verified functional after testi n ? es ❑No ❑NA es ❑No ❑NA ❑Yes ❑No ❑NA CJ Yes ❑No ❑NA <br /> C0Mments—(include inform ation on repairs made prior to testin , and recommended follow-zip br ailed tests) <br /> Q_e� •civ L� t <br /> �.d « Ve v y �($ -7— <br /> N O V ,�j to fit, S e <br /> ' If the entire depth of the sump is not tested, specify how much was tested. If the answer to 4ay of the questions indica <br /> asterisk(*) is"NO"or"NA", the entire sump must be tested. (See SWRCB LG-160) ted with an <br />