My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
437
>
2300 - Underground Storage Tank Program
>
PR0506406
>
COMPLIANCE INFO_1996-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2023 3:00:08 PM
Creation date
6/3/2020 9:58:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2008
RECORD_ID
PR0506406
PE
2361
FACILITY_ID
FA0002313
FACILITY_NAME
WILSON WAY CHEVRON
STREET_NUMBER
437
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15113052
CURRENT_STATUS
01
SITE_LOCATION
437 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506406_437 N WILSON_1996-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />SVaCB, January 2002 Page of <br />SECONDARY PIPE TESTING <br />Test Method Developed By: Piping Manufacturer _ Industry Standard C Professional Engineer <br />❑ Other (S�7ecifyy) <br />Test Method Used: ❑ Pressure ❑ Vacuum 0 Hydrostatic <br />C Ocher (Specify) <br />Test Equipment Used: Equipment Resolution: <br />MRN IN W-, Piping Run # <br />Piping Run # Piping Run # <br />ing Run # <br />Piping Material: <br />Piping Manufacturer: <br />Piping Diameter:' <br />Length offting Run: <br />Product Stored: <br />k <br />Method and location of <br />-rum isolation: <br />�y <br />Wait time between applying <br />pressurelvacuumlwater and <br />test: <br />Test Start Time: <br />Initial Rzading W: <br />Test End Time:. <br />Final Reading iRp): r' <br />Test 'on: <br />Change in Reading <br />Pass/Fail Threshol r <br />Cfiteria- <br />5T. <br />t'!II tl i' ` r" ♦ r i ♦ i♦ •[ r t r r �i r r ♦ s i :r r r. <br />
The URL can be used to link to this page
Your browser does not support the video tag.