Laserfiche WebLink
SWRCB, January 2002 Page of <br />r <br />5. PIPING SUMT TESTING <br />Test Method Developed By: 0 Sump Manufacturer 0 Industry Standard Professional Engineer <br />0 Other (Specify) <br />Test Method Used: Cl Pressure ❑ Vacuum C Hydrostatic <br />❑ Other (SneciAy) <br />�a <br />���~"'�N ` ,'�;,«.Y W F Fz�y. "� '�it���Y'r-?" <br />:tis � .xrf <br />Height from Tank Top to Lowest <br />Electrical Penetratioix <br />Condition of sunW prior to <br />♦ odua and w -. <br />'I Turbine shutdown response time <br />-Frze•+ <br />Was fad -safe vaffied to be <br />I <br />r ~.: ► " r r * i x • 1 ." � ' ,. -Y -. r t ! ! 1}' ■ .:.. <br />:ti ! - f ■ <br />:. Y <br />! Yes ■ No 0 A <br />Comments — (mclude information on remrs made prior to testing, and recommended follaw-up for failed tests) <br />If the entire depth of the sump is not tested, specify how much was tested. if the answer to M of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -260) <br />