Laserfiche WebLink
SWRCB, January 2002 <br /> Page S of <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: i7 UDC Manufacturer [J Indus Standard <br /> try rofessional Engineer <br /> f_J Other(Specify) <br /> Test Method Used: C Pressure U Vacuum <br /> - ffydrostatic <br /> l7 Other(,Specify. <br /> Test Equipment Used: Co ljuj?it T trf oda ���t < q4, Equipment Resolution: <br /> UDC# k UDC 3z UDC# 5- f 1, UDC 7z , <br /> UDC Manufacturer: S-l-crv-, <br /> UDC Material: W-es e." Wes <br /> UDC Depth: f Z ' ` Z4//z ®r �tp ,:,•„�'S <br /> Height from UDC Bottom to Top <br /> of Hi hest Pi in Penetration: <br /> Height from UDC Bottom to p <br /> Lowest Electrical Penetration: t ( 7- <br /> Condition <br /> Condition of UDC prior to <br /> v cl <br /> testing: ,r k t <br /> Portion of UDC Tested �c� e✓ 6421 ®t L Q, W&I1K \ t l , <br /> Does turbine shut down when ` �l I I <br /> UDC sensor detects liquid(both W Yes 0 No 0 NA Yes ❑No ❑NA Yes ❑No ❑NA <br /> product and water)?* l� es 0 No ❑NA <br /> Turbine shutdown res nse time Mu+ ica + CC_ o ltit <br /> Is system programmed for fail- Pj 0+--(L�'e z <br /> safe shutdown?' xyes 0 No ❑NA Yes ❑No 0 NA Yes ❑No 0 NA es 0 No ❑NA <br /> Was fail-safe verified to be <br /> operational?* 0 Yes Flo 0 NA ❑Yes /NNo 0 NA ❑Yes ):No ❑NA 0 Yes No ❑NA <br /> Wait time between 1 ing <br /> pressure/vacuum, ate d <br /> starting test !t) 4 ..r r e t4 4t S rP '--Z'a S f <br /> Test Start Time: i 2-; Li 5 l, e) v <br /> Initial Reading R,): <br /> Test End Time: �� <br /> Final Readin R <br /> ( F)� --va- x'03-� <br /> Test Duration: <br /> f'f r�-a ig YS A rp '"'S f�t�C _..c'i �u P d t•d s-j <br /> Change in Readin (RF-R,): Na c,l„�„ a C� �o <br /> Pass/Fail Threshold or Criteria: a <br /> o " 3vi>t coos Sea-b.d. �. aos- iou*A- . <br /> Test Result: Pass 0 Fail Pass ❑Fail Pass ❑Fail Pass ❑ Fail <br /> Was sensor removed for testing? XYes I;No 0 NA _ es ❑No 0 NA '' es 0 No ❑NA <br /> Was sensor properly replaced and es 0 No ❑NA <br /> verified functional after testing? _ ❑No ❑NA -es--11 No ❑NA ONO ❑NA XYes 0 No ❑NA <br /> Comments —(include information on re airs made prior to testing, and recommended follow-u fbr ailed tests) <br /> If the entire depth of the UDC is not tested, specify how much was tested. If the answer to 41Y 0f the questions indicated with an <br /> asterisk(*) is "NO" or"NA", the entire UDC must be tested. (See SWRCB LG-160) <br />