My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
437
>
2300 - Underground Storage Tank Program
>
PR0506406
>
COMPLIANCE INFO_1996-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2023 3:00:08 PM
Creation date
6/3/2020 9:58:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2008
RECORD_ID
PR0506406
PE
2361
FACILITY_ID
FA0002313
FACILITY_NAME
WILSON WAY CHEVRON
STREET_NUMBER
437
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15113052
CURRENT_STATUS
01
SITE_LOCATION
437 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506406_437 N WILSON_1996-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING PROCEDURES <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all times. The information on this monitoring <br />program are conditions of the operating permit. The permit holder must notify San Joaquin County <br />Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br />procedures, unless required to obtain approval before making the change. <br />Required by Sections 2632(d) and 2641(h) CCR. <br />Facility Name W /Y (f e r 1 <br />Facility Address ZZ '? 7 %Z) / /-l � Al ZL1 1 V S' 7c c X %; s c ii <br />A. Describe the freque cy of performing the <br />Tank <br />Piping A nw <br />B. What methods and equipment, identified by name and model, will be used for <br />Tank ig -62ml Y?,'lG;Ct -6 t/1r <br />Pip <br />C. Describe the location(s) where the monitoring will be performed (facility plot plan <br />should be attached): <br />., > ql 7 _ A/ < //./ ►7/ _ f i AJ 1l//I, C ! C Y�a ,1121',', Af <br />D. List the name(s) and title(s) of the people responsible for performing the monitoring <br />and or maint ining the equip ent: <br />fi ��rYr�� C' � a <br />E. Reporting format for moni oring: <br />Tank tjad&�x &uy 7-,1-5 :? <br />Piping SP ea Y- S&0 xj LC 2 �/ 2 <br />F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br />Maintenance must be in accordance with the manufacturers' maintenance schedule <br />but not less than every 12 months: to V e y % 2- yn G YJ � <br />G. Describe the training necessary fort operation of UST system, including piping, <br />and the monitoring equipment: /17 _ ieyn <br />
The URL can be used to link to this page
Your browser does not support the video tag.