Laserfiche WebLink
WRITTEN MONITORING AND RESPONSE PLAN <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all times. The information on this monitoring program are <br />conditions of the operating permit The permit holder must notify Environmental Health Department, (209) 468-3420 <br />within 30 days of any changes to the monitoring procedures, unless required to obtain approval or a permit before malang <br />the change. Regrdred by CCR 2632 (d) and 2641(h). <br />FAC=Y NAME ' C S S frU� ?11 e V X 0 Y) DATE 2 2% <br />FACHM ADDRESS <br />I .Name(s) and Title(s) of the people responsible for performing the monitoring and/or maintenance <br />-- -� <br />2.Descnbe the frequency of performing the monitoring for. <br />TANKS fi Mai PIPING <br />3.Describe the location(s) of where the monitoring will be performed. ie: location of sensors <br />11 _ n ,. _ , _ "'Al : <br />4.Describe the following equipment for each underground storage tank <br />Name and Model of Monitoring Panel e 1P �C �`,� �- 5 - <br />Name <br />Name and Model of Line Leak Detectors �e L-' 7' d <br />Name and Model of Annular Sensors C X� 1 �'� t� > c� �i t4.7 <br />Name and Model of Piping Sensors / /i / • <br />Name and Model of Dispenser Sensors 120 0 <br />Type of overfill prevention )710 -r '—/ e, N 4 -a ra <br />5.Do the Turbine Sensors and Dispenser Pan Sensors shut down the turbine? Yes �No 0 <br />Does the turbine shut down if a sensor is disconnected? Yes i�No 0 <br />Does the turbine shut down is'the monitoring panel loses power? Yes, No 0 <br />6. How will the alarm history and subsequent maintenance be recorded? <br />7.Mamtenance of the monitoring equipment must be performed at least once every 12 months. <br />Desm--be the preventive maintenance schedule and recording for the monitoring equipment What month will <br />annual monitoring certification be performed in? ' 'e uG? <br />10, <br />bate: Aer new kwallations the swandruy containment must be tested 6 months of ter installatim dU secondary conhwanent systems <br />must be tested once every 36 months with initial testing performed before January 1. 2003. <br />8. Describe the train <br />equipment i M& <br />L-Wnit IInusTunwitringpUnAoc <br />sr3onaot <br />of UST system, including piping, and the monitoring <br />