Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: <br /> Check this box if tank gauging is used only for inventory contrail <br /> El Check this box if r,o tank <,U(Jjnq o! S!R'i-J,wurnvnt is insUled <br /> This section must be completed if in-tank gauging equipment is used to pe�forrn leak detection rrionitaring. <br /> commete the follow ngchecklist: <br /> 0 Yes ED No- Has all input wiring been inspected for proper en"and termination, inr.Juciing ft�stin(lll toi, qfmlmd faura <br /> &------- <br /> Yes [3 No' Were all tank-gauging probes visually inspected for damage and buiNup", <br /> El Yes [I No* Was accuracy of system product level readings tested? <br /> Yes [] No* Was accuracy of system water level readings tested? <br /> 0 Yes ® o" Were all probes reinstalled properly? <br /> El Yes 0 items on the equipment manufacturer's mainteriance,O'leckiist <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected <br /> G. Line Leak Detectors(LLD): ❑ Check this boy if 1 ar�,.not iw,! Ai­4 <br /> com /eta the folloaain ClWrklist <br /> El No* For equipment start-up or annual equipment certification. was a ieak su-nulated is eerily Tnance? <br /> ED Yes ON/A LCheck all that apoly) Simulated leak rate, 0 3 2.p.h. j 10_Ltjph <br /> Yes F1 No- Were all LLDs confirmed operational and aucuiale willim fe(julalo-i <br /> Yes 0 No- Was the testing apparatus properly calibrated? <br /> N—o* <br /> Yes I El N/A For mechanical LLDs,does the LLD restrict product flow,1 it 1jetf!("', <br /> Ej No* <br /> Yes M N/A For electronic LLDs,does the turbine automatically shut off if IN, 1 1 Fj a intik? <br /> LI No- For electronic LLDs,does the turbine automatically shut o f it arly prilif)n of the morworing systc-m is disallic.d or <br /> 0 Yes 0 NIA disconnected? <br /> -D No- For electronic LLDs,does the turbine automatically shut k;Ft if arv_poTl if_; Tf r i-o-f is—or <br /> L0 Yes Z NIA fails a test? <br /> Yes <br /> F1 No' <br /> Y <br /> OYes ED N/A For electronic LLDs,have all accessible wiring connections bean asuaily mspected:' <br /> Yes 's mainterionce checklist completed? <br /> 0 Yes ®No' Were all items on the equipment manufacturer <br /> *In the Section H,below,describe how and when these deficiencies were or will tie corrected. <br /> H. Comments: <br /> Page 3 of 3 <br />