My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
437
>
2300 - Underground Storage Tank Program
>
PR0506406
>
COMPLIANCE INFO_1996-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2023 3:00:08 PM
Creation date
6/3/2020 9:58:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2008
RECORD_ID
PR0506406
PE
2361
FACILITY_ID
FA0002313
FACILITY_NAME
WILSON WAY CHEVRON
STREET_NUMBER
437
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15113052
CURRENT_STATUS
01
SITE_LOCATION
437 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506406_437 N WILSON_1996-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/SIR Equipment: <br /> Check this box if tank gauging is used only for inventory contrail <br /> El Check this box if r,o tank <,U(Jjnq o! S!R'i-J,wurnvnt is insUled <br /> This section must be completed if in-tank gauging equipment is used to pe�forrn leak detection rrionitaring. <br /> commete the follow ngchecklist: <br /> 0 Yes ED No- Has all input wiring been inspected for proper en"and termination, inr.Juciing ft�stin(lll toi, qfmlmd faura <br /> &------- <br /> Yes [3 No' Were all tank-gauging probes visually inspected for damage and buiNup", <br /> El Yes [I No* Was accuracy of system product level readings tested? <br /> Yes [] No* Was accuracy of system water level readings tested? <br /> 0 Yes ® o" Were all probes reinstalled properly? <br /> El Yes 0 items on the equipment manufacturer's mainteriance,O'leckiist <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected <br /> G. Line Leak Detectors(LLD): ❑ Check this boy if 1 ar�,.not iw,! Ai4 <br /> com /eta the folloaain ClWrklist <br /> El No* For equipment start-up or annual equipment certification. was a ieak su-nulated is eerily Tnance? <br /> ED Yes ON/A LCheck all that apoly) Simulated leak rate, 0 3 2.p.h. j 10_Ltjph <br /> Yes F1 No- Were all LLDs confirmed operational and aucuiale willim fe(julalo-i <br /> Yes 0 No- Was the testing apparatus properly calibrated? <br /> N—o* <br /> Yes I El N/A For mechanical LLDs,does the LLD restrict product flow,1 it 1jetf!("', <br /> Ej No* <br /> Yes M N/A For electronic LLDs,does the turbine automatically shut off if IN, 1 1 Fj a intik? <br /> LI No- For electronic LLDs,does the turbine automatically shut o f it arly prilif)n of the morworing systc-m is disallic.d or <br /> 0 Yes 0 NIA disconnected? <br /> -D No- For electronic LLDs,does the turbine automatically shut k;Ft if arv_poTl if_; Tf r i-o-f is—or <br /> L0 Yes Z NIA fails a test? <br /> Yes <br /> F1 No' <br /> Y <br /> OYes ED N/A For electronic LLDs,have all accessible wiring connections bean asuaily mspected:' <br /> Yes 's mainterionce checklist completed? <br /> 0 Yes ®No' Were all items on the equipment manufacturer <br /> *In the Section H,below,describe how and when these deficiencies were or will tie corrected. <br /> H. Comments: <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.