Laserfiche WebLink
4 The diesel and 87-octane line leak detectors at West Lane were tested and failed on <br /> October 8, 2007, and was not replaced and retested until October 29, 2007. <br /> Title 23, CCR Section 2637 (a) Secondary containment test performed. Secondary <br /> containment systems installed on or after January 1, 2001 shall be tested upon installation, 6 <br /> months after installation, and every 36 months thereafter. Secondary containment systems <br /> installed prior to January 1, 2001 shall be tested by January 1, 2003 and every 36 months <br /> thereafter. <br /> Secondary containment testing est Lane was due by April 2005 and was <br /> performed n July 20, 2005, three months late. <br /> 4 Secondary containment testing at West Lane was due by July 2008 and <br /> performed on November 20, 2008, four months late. <br /> 4 Secondary containment testing t Wilson Way wasu July 2008 and was <br /> performed on October 1 , 2008, three months late. <br /> Title 23, CCR Section 2638 (a) Annual monitoring system certification and line leak <br /> detector test. All monitoring equipment used to satisfy the requirements of this article shall be <br /> installed, calibrated, operated and maintained in accordance with manufacturer's instructions, <br /> and certified every 12 months for operability, proper operating condition, and proper calibration. <br /> Written records shall be maintained as required in section 2712. <br /> Annual monitoring system certification and leak detector testing t West Lane were <br /> due by March 2004 and were performed on May 3, 2004, two months late. <br /> Annual monitoring system certification and leak detector testing Charter Way were <br /> due by August 2004 and were performed on September 30, 2004, one month late. <br /> Annual monitoring system certification and leak detector testing at West Lane were <br /> due by May 2005 and were performed on July 1 , 2005, two months late. <br /> -* Annual monitoring system certification and leak detector testing t Wilson Way were <br /> due by August 2005 and were performed on September 1 , 2005, one month late. <br /> 3 Annual monitoring system certification and leak detector testing est Lane were <br /> due by July 2006 and were performed on September 20, 2006, two monthslate. <br /> Annual monitoring system certification and leak detector testing t Wilson Way were <br /> due by September 2006 and were performed on November 16, 2006, two months late. <br /> Annual monitoring system certification and leak detector testing t West Lane were <br /> e by September 2007 and were performed on October 8, 2007, one month late. <br /> Annual monitoring system certification and leak detector testing t Charter Way were <br /> due by September 2007 and were performed on October 18, 2007, one month late. <br /> 4 Annual monitoring system certification and leak detector testing Wilson were <br /> due by November 2007 and were performed on March 3, 2008, four months late. <br /> Annual monitoring system certification and leak detector testing t West Lane were <br /> due by October 2008 and were performed on November 6, 2008, one month late. <br /> Title 23, CCR 263 ( ) Monitoring system certification test report. UST owners and <br /> operators shall submit a completed "Monitoring System Certification" form to the local agency <br /> within 30 days after completion of the inspection. <br /> The September 20, 2006, monitoring system certification test report for West Lane <br /> was never submitted to the EHD. <br /> The November 16, 2006, monitoring system certification test report for Wilson <br /> was submitted on April 7, 2008, 17 months late. <br /> 4 The October 18, 2007, monitoring system certification test report for Charter Way was <br /> 26 <br />