Laserfiche WebLink
6T6T6M5 CE <br /> Page 4 of 8 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer O Industry Standard ❑Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ® Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Caldwell Equipment Resolution: <br /> 00 SU <br /> 6 sump sump sump <br /> Sump Diameter: 42" <br /> Sump Depth: 59" <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 28„ <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 8„ <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry <br /> Portion of Sump Tested' 2" above product <br /> Does turbine shut down when sump <br /> sensor detects liquid(both product and ❑ Yes ❑ No ® NA ❑ Yes ❑ No ® NA ❑Yes ❑ No ® NA ❑ Yes ❑ No ® NA <br /> water)T <br /> Turbine shutdown response time -------------- See Comments -------------- <br /> Is system programmed for fail-safe ❑ Yes ❑ No ® NA ❑ Yes ❑ No ® NA ❑Yes ❑ No N NA ❑Yes ❑ No ® NA <br /> shutdownT <br /> Was fail-safe verified to be ❑ Yes ❑ No ® NA ❑ Yes ❑ No ® NA ❑ Yes ❑ No ® NA ❑ Yes ❑ No N NA <br /> o erationalT <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 min <br /> test: <br /> Test Start Time: 09:50 AM <br /> Initial Reading(Ri): 0.0025 <br /> Test End Time: 10:20 AM_ <br /> Final Reading(RF): 0.0025 <br /> Test Duration: 30 min <br /> Change in Reading(RF-Ri): 0 <br /> Pass/Fail Threshold or Criteria: 1/16" hr <br /> Test Result: 0 Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass O Fail <br /> Was sensor removed for testing? ®Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> Was sensor properly replaced after ®Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> testin ? <br /> Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> Turbine shutdown done during Annual Monitor Certification. <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to M of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB 1,G-160) <br />