Laserfiche WebLink
9Y6TEM8 CE <br /> Page 5 of 8 <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC)TESTING <br /> Test Method Developed By: ❑ UDC Manufacturer ❑ Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑ Pressure ❑Vacuum ❑ Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> UDC # UDC # UDC # UDC # <br /> rUDCManufacturer:!: <br /> Height from UDC Bottom to Top of <br /> Highest Piping Penetration: <br /> Height from UDC Bottom to Lowest <br /> Electrical Penetration: <br /> Condition of UDC prior to testing: <br /> Portion of UDC Tested' <br /> Does turbine shut down when UDC <br /> sensor detects liquid(both product ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA <br /> shutdown?` <br /> Was fail-safe verified to be ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> op erational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting <br /> test <br /> Test Start Time: <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading RF-Ri): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: ❑ Pass ❑ Fair ❑ Pass ❑Fall ❑ Pass L1 Fail ❑ Pass C3 fail <br /> Was sensor removed for testing? ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> Was sensor properly replaced after ❑ Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> ing? <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to M of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />