Laserfiche WebLink
APR-30-2010 FRI 05: 26 PIS 0 P. 009 <br /> OfW <br /> '/C <br /> Page 4 of 14 r"`' <br /> 8. SECONDARY PIPE TESTING <br /> Test Method Developed By: c3 Piping ManfiMmrar Q Industry Standard ❑Pmfe*siansl Engineer <br /> ❑other(Spetrify) <br /> Test Method Used: 1Z prewire O Varum ®Hydroshft <br /> Q Other(Specify) <br /> Tog Equipment Used: Pressure Gauge Equi RSsobJtion: 0-30 psi <br /> Piping Run# 1 Piping Run#Z Piping Run#3 Piping Rune*4 <br /> Piping Material: Fiberglass Fiberglass Fibe lass Fiberglass <br /> Menu er: Smith Smith Smith Smith <br /> Piping !l <br /> Diameter: 4N 4" e4t0 40 <br /> Lwo of Piping ftn: 160` 165' 100' 140' <br /> Product Stored: Prem Reg - Diesel Diesel <br /> Method and loodon of piping` Sump to UDC Sump to UDC Sump to UDC Sump to UDC <br /> run" <br /> Wait ane between*Wng <br /> pressurvivacuumikvater and 5 min 5 min 5 min 5 min <br /> Starting test: <br /> Test Start Too: 11:15 AM 11:15 AM 11:15 AM 11:15 AM <br /> Initiid R R¢: 5 psi 5 psi 5 psi 5 i <br /> Test End rare; 12:15 PM 12:YS PM 12:15 PM 12:15 PM <br /> Final ReWing(RF): 5 psi 9251 5 psi 5 psi <br /> Test Duralion: 1 hr i hr 1 hr 1 hr <br /> Change in ReadN(Rpa: 0 0 0 0 <br /> Pass/Fall Threftid or Criteria: ® 0 0 0 <br /> Test. M .Pan's. 0`.F4iF PM'd.ft. 11 Wpbgs. 0 Fail ®Pass O Fail <br /> Comments-#mlyde k6modon on reRg2 made prior to tegnq,and recoMM&WO 4 p for f8W M <br /> EZf90 3 7d TIIH >onl-10 CZGC66ET99 96:et 0T8Z/ZZ/v0 <br />