Laserfiche WebLink
APR-30-2010 FRI 05: 27 PM P, 010 <br /> A 3t9Ft4 Flp� <br /> � <br /> 9. SECONDARY PIPE TESTING <br /> Test Mood Develow 6y: 0 Piping Manufactuw 21 Indus"Standard ®Professional Engineer <br /> ra Other S <br /> Test Mettwd Used: ®Pressure D Vacuum U Hydrostatic <br /> Q Other(Spervfy,! <br /> Test EqA=nt Used: Pressure Gauge Equipe atResolution: 0-30 psi <br /> ag Run #5 Piping Run# Plping Run # Piping Run # <br /> Bing Material: Fiberglass. <br /> I�n1g <br /> I Manufacturer Smith <br /> Pip'Ing Diaineter 4" <br /> Length of Piping Run: 10' <br /> Product Stored: Diesel <br /> Method and location of piping- Sump to Sump <br /> run isolation: <br /> Wait d"between applying <br /> pre wmdvacuumtwdterand 5 min <br /> smog wst: <br /> TW Start Time: 11:15 AM <br /> Initial Reading(Rr); 5 psi <br /> Test End TRna: 12:15 PM <br /> Find Reading(Ac): 5 psi <br /> Test Duration: 1 hr <br /> Change in Reading(RFA): 0 <br /> Pass/Fail Th d or Criteria 0 <br /> Test Result ®Pon Q Feil Q Past D FWI C1 Prism Cit Fail 0-Pws ❑ Fail <br /> Cotnmwft-fmdude#Awnatbn on reperrx made ariprto testirnt,and ded fbibu. p forfailedtesis} <br /> e+e <br /> EZ/90 39vd 1"jH XOnHO EZSEE6£T99 SE:0T OTOZ/ZZ/08 <br />