Laserfiche WebLink
APR-30-2010 PRI 05: 38 PM P. 031 <br /> —Now <br /> Adow <br /> Page 3 of 8 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping Manufacturer 21 Industry Standard C3 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: Q Pressure E3 Vacuum L3 Hydrostatic <br /> zi Other(SpecIFY) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 0-30 psi <br /> Piping Run # Piping Run # Piping Run # Piping Run# <br /> Piping Material: <br /> Piping Manufacturer. <br /> Piping Diameter. <br /> Length of Piping Run: <br /> Product Stored* <br /> Method and location of piping- <br /> run isolation: <br /> wait time between applying <br /> pressuretvacuum/water and <br /> Starting test <br /> Test Start Time. <br /> Initial Reading(k), <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF Ri): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result 0.Pass: 3 Fail 'DRass-0.Fall 0 Pass El Fail E3 P.ass Cl i:ail. <br /> Comments-(include information on repairs made prior to testing,and recommended follow-up for failed Lqgs) <br />