Laserfiche WebLink
APR-30-2010 FRI 05:38 PM P. 032 <br /> Page 4 of 8 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: u Sump Manufacturer 10 Industry Standard Ej Professional Engineer <br /> [a Other(Specify) <br /> Test Method Used: C1 Pressure D Vacuum ER Hydrostatic <br /> M Other(Specify) <br /> Test Equipment Used, Caldwell Equipment Resolution; <br /> NO - Sump 6 Sump Sump Sump <br /> urnp,Diameter. 42" <br /> Sump Depth. 591, <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 28" <br /> Highest Piping Penetration, <br /> Height from Tank Top to Lowest 810 <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry <br /> Portion of Sump Tested' 2" above product <br /> Does turbine shut down when sump <br /> sensor detects liquid(both product and 13 Yes Ll No 0 NA 13 Yes U No 0 NA Q Yes C1 No 13 NA 13 Yes C3 No 9 NA <br /> water?" I I I <br /> Turbine shutdown response time -------------- See Comments -------------- <br /> Is system programmed for fall-safe (3 Yes U No 0 NA E3 Yes 13 No 0 NA Q Yes 0 No 0 NA C1 Yes 0 No 9 NA <br /> shutdown?' <br /> Was fail-sat verified to be (3 Yes 13 No 9 NA 0 Yes E3 No 9 NA (3 Yes 0 No 9 NA U Yes U No IN NA <br /> 22arationair <br /> Wait time between applying <br /> pressurelvacuum/water and starting 5 min <br /> test <br /> Test Start Time: 09:50 AM <br /> initial Reading(Ri): 0.0025 <br /> -Test End Time: 10:20 AM <br /> Final Reading(RF): 0.0025 <br /> Test Duration: 30 min <br /> Change in Reading(Rr-Rl)-. 0 <br /> Pass/Fall Threshold or Criteria- 1/16" hr <br /> Test Result- ZSO <br /> �Pi -❑:P*ss 0 Fail apess 13 Fair 13 Pass U Fail <br /> Was sensor removed for testing? 0 Yes U No E3 NA E3 Yes Q No E3 NA U Yes Q No Q NA Q Yes C3 No C1 NA <br /> Was sensor properly replaced after 3 Yes 0 No 0 NA 0 Yes 0 No 13 NA 0 Yes 0 No E3 NA C3 Yes 13 No E3 NA <br /> testing? I I I ff <br /> Comments-(include information on repairs made prior to tesgrig,and recommended followZu or tests)..p f 61W #JS <br /> Turbine shutdown done during Annual Monitor Certification. <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to My of the questions indicated with an <br /> asterisk(*)is"NO"or"NA!',the entire sump must be tested. (See SWRCB LG-160) <br />