Laserfiche WebLink
SWRCB,January 2002 Page of 1 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard ❑Professional Engineer <br /> X Other(Spec) Incon <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used: Incon TS-STS Sump Test System Equipment Resolution: 0.002 <br /> Sump#87 STP Sump#91 STP Sump#DSL Sump#DSL East <br /> Si hon High Flow <br /> Sump Diameter: 42" 42" 42" 42" <br /> Sump Depth: 65" 63" 72" 72" <br /> Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 16" 19" 23" 23" <br /> Hi hest Pi ing Penetration: <br /> Height from Tank Top to Lowest 15" 14" 18" 12" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: dirty dirty dirty dirty <br /> Portion of Sump Tested' 1/3 1/3 1/3 1/3 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑ Yes ❑No X NA ❑Yes ❑No X NA ❑Yes ❑No X NA ❑Yes ❑No X NA <br /> product and water)?* <br /> Turbine shutdown response time N/A N/A N/A N/A <br /> Is system programmed for fail-safe ❑ Yes ❑No X NA ❑Yes ❑No X NA ❑ Yes ❑No X NA ❑Yes ❑No X NA <br /> shutdown?* <br /> Was fail-safe verified to be <br /> operational?* <br /> fail-safe <br /> ❑ Yes ❑No X NA ❑Yes ❑No X NA ❑Yes ❑No X NA ❑Yes ❑No X NA <br /> Wait time between applying 5 min 5 min 5 min <br /> pressure/vacuum/water and starting 5 min <br /> test: <br /> Test Start Time: 11:23 12:26 2:15 3:34 <br /> Initial Reading(Rj): 5.1079 3.6192 2.7415 4.5371 <br /> Test End Time: 11:38 12:41 2:30 3:49 <br /> Final Reading(RF): 5.1088 3.6191 2.7419 4.5376 <br /> Test Duration: 15 min 15 min 15 min 15 min <br /> Change in Reading(RF-Ri): 0.0009 0.0001 0.0004 0.0005 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> �Gilry; 'i1p*Iirh tsa' -�,.., m;(iPB F <br /> Test Ileui>*7, f ,.fi ,, fail X Pas C1jFEr ss <br /> 9a . �,w. <br /> Was sensor removed for testing? X Yes ❑No ❑NA X Yes ❑No ❑NA X Yes ❑No ❑NA X Yes ❑No ❑NA <br /> Was sensor properly replaced and X Yes ❑1 ❑NA X Yes ❑No ❑NA X Yes ❑No ❑NA X Yes ❑No ❑NA <br /> verified functional after testin ? <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> I <br /> 2015 <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to aM of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />